
n
SAIL SETTING
STANDARD MAINSAIL
When the mainsail is on the deck:
- Screw the pins of the mast sliders into their boxes.
- Put in the battens starting from the leech.
- Screw the cap of the box till you get the desired tension (the tension screw
shall not stick out of the sail).
Mind you do not forget the locking screw.
- Put the mainsail in the lazy-bag.
- Set the mainsail onto its slides, begin with the head board and fi nish with
the tack.
ROLLER FURLING MAINSAIL
- Remove the hatch giving access to the furling gear.
- Spread the sail on the deck.
- Fasten the head (Strap) onto the shackle of the upper swivel. Pay attention
to the furling direction.
- Reeve the leech adjustment pennant through the clew block.
- Hoist the sail.
Guide the bolt rope (Sometimes the groove is not polished enough at its be-
ginning).
- When the sail is hoisted, board the main tack to the lower shackle.
- Sway up but do not force.
- Put the access hatch back.
- Furl the sail head to wind, keeping a very slight tension on the foot.
The boom vang and mainsheet shall be eased off.
ROLLER FURLING GENOA
Hoist the genoa before you get under way, taking advantage of a windless
period of time.
- Secure the head.
- Secure the halyard to the slide-swivel.
- Secure the tack to the drum and secure the sheets.
- Insert carefully the bolt rope into the hole, hoist the sail and take care you
do not tear it.
- Haul the halyard taut enough but sway it up less than a sail on a standard
stay.
- Hoist it until the horizontal creases disappear (the tension of the luff shall be
adjusted after a few sea trips).
- Pull on the line from the cockpit to furl the genoa.
RIGGING / SAILS
3.5
SAILS
33
3
Содержание 53
Страница 1: ...USER GUIDE...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 9: ...7 1 SPECIFICATIONS 1 1 I D OF YOUR BOAT 1 2 TECHNICAL SPECIFICATIONS...
Страница 10: ......
Страница 14: ......
Страница 16: ...14...
Страница 28: ......
Страница 44: ......
Страница 52: ......
Страница 64: ......
Страница 65: ...WATERSYSTEMS 6 1 BILGE PUMP SYSTEM 6 2 GREY WATERS 6 3 BLACK WATERS 6 4 FRESH WATER 6 5 WATERMAKER 63 6...
Страница 76: ......
Страница 77: ...ELECTRICITY 7 1 12 V CIRCUIT 7 2 INVERTER 7 3 230 V CIRCUIT 7 4 ELECTRONICS 75 7...
Страница 90: ......
Страница 100: ......
Страница 101: ...WINTERSTORAGE 9 1 LAYING UP 9 2 PROTECTION 99 9...
Страница 102: ...100...
Страница 104: ......
Страница 105: ...HANDLING 10 1 PREPARATION 10 2 CRANE LIFTING 10 3 MAST STEPPING AND REMOVAL 103 10...
Страница 106: ...104 CRANE LIFTING INSTRUCTIONS CRANE LIFTING INSTRUCTIONS 400 mm 1000 mm...
Страница 108: ......
Страница 110: ...108...
Страница 120: ......
Страница 121: ...MAINTENANCE 12 1 MAINTENANCE SCHEDULE 119 12...
Страница 124: ......
Страница 126: ......
Страница 127: ......
Страница 128: ......