Installation area

The distance between JÄSPI Inverter Nordic and the house wall must be at least 350 mm, but not more than 500 mm
in locations that are exposed to the wind. The free space above JÄSPI Inverter Nordic must be at least 1,000 mm.
The free space in front must be at least 1,000 mm for any future servicing.

350 mm

Fritt utrymme bakom

Fritt utrymme framför 

dock 1000 mm för ev. framtida service

Min. avstånd
vid användning
av flera F2300

600 mm

 1000 mm

400 mm 

Minimalt 
fritt utrymme

600mm 

Minimalt 
fritt utrymme

Minimum free
space

Minimum free space

Minimum distance during use
of several JÄSPI Inverter Nordic

600 mm

600 mm

At least 1,000

mm

Free space behind*

350 – 500 mm

400 mm

Free space in front for any future servicing

* The space behind must not exceed 500 mm in locations that are exposed to the wind.

JÄSPI Inverter Nordic

Chapter 2 |

Delivery and handling

10

Содержание Inverter Nordic 8

Страница 1: ...Installer manual LEK J SPI Inverter Nordic 8 12 16 20 Air water heat pump IHB EN 2214 2 531786...

Страница 2: ......

Страница 3: ...al connections 22 General 22 Accessibility electrical connection 23 Connections 28 6 Commissioning and adjusting 28 Preparations 28 Balance temperature 28 Filling and venting 28 Start up and inspectio...

Страница 4: ...llation and wiring must be carried out in accordance with national provisions J SPI Inverter Nordic must be installed via an isolator switch The cable area has to be dimensionedbasedonthefuseratinguse...

Страница 5: ...nd at the top left on the rear cover and at the bottom on the side LEK Data Serie nr Art nr 711453 OUT IN Caution You need the product s 14 digit serial number for servicing and support 5 Chapter 1 Im...

Страница 6: ...rain valve Charge flow set Electricity see section Electrical connections Fuses property Safety breaker Earth circuit breaker Heating cable type effect Fuse size heating cable F3 Communication cable c...

Страница 7: ...Indoor module J SPI Tehowatti Air Stainless Steel 3 x 400 V LVI Code 505 85 28 Control module J SPI MCU40 Control module LVI Code 526 01 53 7 Chapter 1 Important information J SPI Inverter Nordic...

Страница 8: ...that can lift it to the installation location When J SPI Inverter Nordic is lifted with a crane the packaging must be untouched If a crane vehicle cannot be used the J SPI Inverter Nor dic can be tran...

Страница 9: ...ls reduced power and impaired efficiency The evaporator must be sheltered from direct wind which negatively affects the defrosting function Place J SPI Inverter Nordic protected from wind against the...

Страница 10: ...e bakom Fritt utrymme framf r dock 1000 mm f r ev framtida service Min avst nd vid anv ndning av flera F2300 600 mm 1000 mm 400 mm Minimalt fritt utrymme 600mm Minimalt fritt utrymme Minimum free spac...

Страница 11: ...sible is used The section of the pipe that can be affected by frost must be heated by the heating cable to prevent freezing TIP Pipe with heating cable for draining the condensation water trough is no...

Страница 12: ...none of the recommended alternatives is used good lead off of condensation water must be assured Supplied components J SPI Inverter Nordic 8 J SPI Inverter Nordic 12 Filterball G1 LEK LEK 2 x flexibl...

Страница 13: ...Removing the side panel and top panel Unscrew the screws and lift off the top panel LEK 13 Chapter 2 Delivery and handling J SPI Inverter Nordic...

Страница 14: ...230V LEK GQ1 AA2 UB1 BT12 EP2 XL1 BT3 XL2 HS1 XL21 BT84 QN1 QN4 RM1 QN2 BP11 QN34 BT15 BT14 EB10 QA40 GQ10 BT17 RA1 BP9 BP1 BP2 BP8 XL20 BT81 HQ9 CA1 X6 J SPI Inverter Nordic Chapter 3 The heat pump d...

Страница 15: ...rdic 3x400V LEK GQ1 AA2 UB1 BT12 EP2 XL1 BT3 XL2 HS1 XL21 BT84 QN1 QN4 RM1 QN2 BP11 QN34 BT15 BT14 EB10 QA40 GQ10 BT17 RF2 RA1 BP9 BP1 BP2 BP8 XL20 BT81 HQ9 PF1 15 Chapter 3 The heat pump design J SPI...

Страница 16: ...LEK Data Serie nr Art nr 711453 OUT IN PZ4 BT16 PZ1 BT28 EP1 WM5 XL40 XL1 XL2 PZ3 PZ3 J SPI Inverter Nordic Chapter 3 The heat pump design 16...

Страница 17: ...uid pipe BT15 Temperature sensor evaporator BT16 Temperature sensor suction gas BT17 Temperature sensor ambient BT28 Temperature sensor suction gas evaporator BT84 Electrical components Base card AA2...

Страница 18: ...block communications X22 Terminal block communications X23 Terminal block fan X24 Terminal block expansion valve QN1 X27 Fuse operating 230V 4A F1 Fuse operating 230V 4A F2 Fuse for external heating c...

Страница 19: ...BP9 Pressure sensor injection BP11 Temperature sensor return BT3 Temperature sensor condenser supply line BT12 Temperature sensor hot gas BT14 Temperature sensor fluid pipe BT15 Temperature sensor ev...

Страница 20: ...e return line sensor Water volumes Depending on the size of your J SPI Inverter Nordic an available water volume is required to prevent short op erating times and to enable defrosting For the optimum...

Страница 21: ...lled from the indoor module control module It has a built in frost protection function and for this reason must not be switched off when there is a risk of freezing At temperatures below 2 C the charg...

Страница 22: ...cation cable must be a screened cable with three conductors Connect the charge pump to the indoor module con trol module See where the charge pump must be connected in the installation manual for your...

Страница 23: ...nnection 1 x 230 V L1 L2 L3 PE N X1 Connection 3 x 400 V L1 L2 L3 PE N X1 At installation install the screwed connection on the rear of the heat pump The part of the screwed joint that tensions the ca...

Страница 24: ...are version In order for J SPI Inverter Nordic to be able to commu nicate with indoor module control module the software version must be according to the table Software version Indoor module Control m...

Страница 25: ...75 mm to terminal block X22 1 4 For connection in the indoor module control module See the Installer Manual for the indoor module control module J spi Tehowatti AIR Inomhusmodul F2120 AA3 X4 3 2 1 4 G...

Страница 26: ...dic has the address 1 as standard In a cascade connection all J SPI Inverter Nordic must have a unique address The address is coded in binary The communication address for J SPI Inverter Nordic to the...

Страница 27: ...ccessories can be found in the installation instructions provided for the respective accessory See section Accessories for a list of the ac cessories that can be used with J SPI Inverter Nordic 27 Cha...

Страница 28: ...ation with J SPI Inverter Nordic is wanted DIP switch S1 position 4 must be changed according to the description in section Cooling 3 Turn the isolator switch on 4 Ensure that the J SPI Inverter Nordi...

Страница 29: ...Adjustment may be required especially for charging a separate water heater It is therefore recommended to have the option of adjusting the flow across the water heater using a trim valve 1 Recommendat...

Страница 30: ...er Flashes Neither defrosting nor pro tection is active Not lit DEFROST green Some protection is active Flashes Defrosting in progress Continuous light No errors Not lit ERROR red Info alarm temporar...

Страница 31: ...ting 2 The fan stops and the compressor continues to run 3 When defrosting is complete the four way valve switches back to heating operation The compressor speed is locked for a short period 4 The amb...

Страница 32: ...e detection nor mally occurs automatically in connection with start up of the indoor module control module This setting can be changed manually Current limitation Here you set whether the current limi...

Страница 33: ...ed if ice snow sticks to the fan grille or fan cone which may be noticed due to abnormal fan noise from J SPI Inverter Nordic Fan de icing means that the fan grille and fan cone are heated using hot a...

Страница 34: ...d if certain compressor speeds cause noise disturbance in the house BlockFreq 2 Here you can select a frequency range within which the heat pump is not permitted to work Defrosting Here you can change...

Страница 35: ...C Resistance kOhm Temperature C 3 047 56 20 10 2 889 33 02 0 2 673 20 02 10 2 399 12 51 20 2 083 8 045 30 1 752 5 306 40 1 426 3 583 50 1 136 2 467 60 0 891 1 739 70 0 691 1 246 80 35 Chapter 8 Servic...

Страница 36: ...eck that J SPI Inverter Nordic is correctly installed in the indoor module J SPI Tehowatti Air or the control module J SPI MCU40 Check that the communication cable is correctly con nected and working...

Страница 37: ...stem temperature and or flow too low 10 failed consecutive defrostings Unsuccessful defrosting 236 228 2 Insufficient available system volume Significant wind effect Poor flow poor heat transfer Opera...

Страница 38: ...ak Disruption in supply voltage Temporary fault in inverter 2 times within 60 minutes Safety stop inverter 323 427 110 Disruption in supply voltage Temporary fault in inverter 3 times within 2 hours S...

Страница 39: ...49 132 Defective compressor Disruption in supply voltage The output current from the inverter to the compressor has been tempor arily too high 3 times within 2 hours or continuously for 1 hour High cu...

Страница 40: ...on water pipe different lengths KVR 11 10 1 metres KVR 11 30 3 metres KVR 11 60 6 metres Water heater Accumulator tank J SPI Buffer 270 LVI Code 536 01 56 J SPI Buffer 100 LVI Code 505 85 28 J SPI Buf...

Страница 41: ...8 F2120 1130 1055 40 52 65 85 470 35 65 1030 180 475 70 110 610 40 J SPI Inverter Nordic 12 16 20 F2120 1280 1205 40 52 65 85 470 35 65 1130 180 475 70 110 612 40 41 Chapter 11 Technical data J SPI I...

Страница 42: ...pressure levels are further affected by walls bricks differences in ground level etc and should therefore only be seen as guide values 2 m 6 m 10 m LEK 20 16 12 8 J SPI Inverter Nordic 55 55 53 53 LW...

Страница 43: ...rature C Supply temperature Return temp Outdoor temperature C J SPI Inverter Nordic 16 J SPI Inverter Nordic 20 Returledningstemperatur Framledningstemperatur 10 15 20 25 30 35 40 45 50 55 60 65 70 75...

Страница 44: ...r 55 C 0 1 2 3 4 5 6 COP Supply temperature 35 C Supply temperature 45 C Supply temperature 55 C COP Outdoor temperature C J SPI Inverter Nordic 12 1 0 2 3 4 5 6 7 8 9 10 25 20 15 10 5 0 5 10 15 F2120...

Страница 45: ...tdoor temperature C Supply temperature 45 C Supply temperature 55 C COP J SPI Inverter Nordic 20 2 4 6 8 10 12 18 16 14 25 20 15 10 5 0 5 10 15 F2120 20 Max och min uppv rmningskapacitet Framledningst...

Страница 46: ...mperature 25 C Supply temperature 18 C Supply temperature 7 C Outdoor temperature C J SPI Inverter Nordic 16 2 0 3 0 4 0 5 0 6 0 10 0 9 0 8 0 7 0 15 20 25 30 35 40 45 Utomhustemperatur C F2120 16 Max...

Страница 47: ...35 C 55 C4 Electrical data 400 V 3N 50 Hz 400 V 3N 50 Hz 230 V 50 Hz Rated voltage 7 6 14 Arms Max operating current heat pump 6 5 13 Arms Max operating current compressor 45 40 40 W Max power fan 10...

Страница 48: ...e package also takes the controller into account If an external supplementary boiler or solar heating is added to the package the overall efficiency of the package should be recalculated 3 Scale for t...

Страница 49: ...Electrical data 400 V 3N 50 Hz Rated voltage 11 9 5 Arms Max operating current heat pump 10 8 5 Arms Max operating current compressor 80 68 W Max power fan 13 10 Arms Fuse IP24 Enclosure class Refrig...

Страница 50: ...kage also takes the controller into account If an external supplementary boiler or solar heating is added to the package the overall efficiency of the package should be recalculated 3 Scale for the pr...

Страница 51: ...452 1 939 kWh Annual energy consumption space heating warm cli mate 1448 1448 1473 1473 kWh Annual energy consumption water heating warm climate 167 138 167 138 159 130 158 130 Seasonal space heating...

Страница 52: ...W Pdh Tj 15 C if TOL 20 C C 10 TOL Min outdoor air temperature C 7 Tbiv Bivalent temperature COPcyc Cycling interval efficiency kW Pcych Cycling interval capacity C 65 WTOL Max supply temperature 0 99...

Страница 53: ...C if TOL 20 C C 10 TOL Min outdoor air temperature C 7 Tbiv Bivalent temperature COPcyc Cycling interval efficiency kW Pcych Cycling interval capacity C 65 WTOL Max supply temperature 0 99 Cdh Degrada...

Страница 54: ...5 C if TOL 20 C C 10 TOL Min outdoor air temperature C 7 Tbiv Bivalent temperature COPcyc Cycling interval efficiency kW Pcych Cycling interval capacity C 65 WTOL Max supply temperature 0 99 Cdh Degra...

Страница 55: ...5 C if TOL 20 C C 10 TOL Min outdoor air temperature C 7 Tbiv Bivalent temperature COPcyc Cycling interval efficiency kW Pcych Cycling interval capacity C 65 WTOL Max supply temperature 0 99 Cdh Degra...

Страница 56: ...art Specification Sheet 051152 2 Page 2 5 Created 2020 01 28 11 24 MLG 2020 01 28 Production GBN 2016 08 23 230V 50Hz 8 12kW 0 001 J SPI INVERTER HPM 8 12 J SPI INVERTER HPM 8 12 051152 2 J SPI Invert...

Страница 57: ...heet 051152 2 Page 3 5 Created 2020 01 28 11 24 MLG 2020 01 28 Production GBN 2016 08 23 230V 50Hz 8 12kW 0 001 J SPI INVERTER HPM 8 12 J SPI INVERTER HPM 8 12 051152 2 57 Chapter 11 Technical data J...

Страница 58: ...heet 051152 2 Page 4 5 Created 2020 01 28 11 24 MLG 2020 01 28 Production GBN 2016 08 23 230V 50Hz 8 12kW 0 001 J SPI INVERTER HPM 8 12 J SPI INVERTER HPM 8 12 051152 2 J SPI Inverter Nordic Chapter 1...

Страница 59: ...heet 051152 2 Page 5 5 Created 2020 01 28 11 24 MLG 2020 01 28 Production GBN 2016 08 23 230V 50Hz 8 12kW 0 001 J SPI INVERTER HPM 8 12 J SPI INVERTER HPM 8 12 051152 2 59 Chapter 11 Technical data J...

Страница 60: ...on Sheet 051153 2 Page 2 5 Created 2020 01 28 11 24 MLG 2020 01 28 Production GBN 2016 08 23 400V 3N 50Hz 8 20kW 0 001 J SPI INVERTER HPM 8 20 J SPI INVERTER HPM 8 20 051153 2 J SPI Inverter Nordic Ch...

Страница 61: ...eet 051153 2 Page 3 5 Created 2020 01 28 11 24 MLG 2020 01 28 Production GBN 2016 08 23 400V 3N 50Hz 8 20kW 0 001 J SPI INVERTER HPM 8 20 J SPI INVERTER HPM 8 20 051153 2 61 Chapter 11 Technical data...

Страница 62: ...eet 051153 2 Page 4 5 Created 2020 01 28 11 24 MLG 2020 01 28 Production GBN 2016 08 23 400V 3N 50Hz 8 20kW 0 001 J SPI INVERTER HPM 8 20 J SPI INVERTER HPM 8 20 051153 2 J SPI Inverter Nordic Chapter...

Страница 63: ...eet 051153 2 Page 5 5 Created 2020 01 28 11 24 MLG 2020 01 28 Production GBN 2016 08 23 400V 3N 50Hz 8 20kW 0 001 J SPI INVERTER HPM 8 20 J SPI INVERTER HPM 8 20 051153 2 63 Chapter 11 Technical data...

Страница 64: ...al connections 22 Communication 24 Configuration using DIP switch 26 Connecting accessories 27 Connections 23 General 22 Power connection 23 Energy labelling 51 Data for energy efficiency of the packa...

Страница 65: ...8 Component locations 14 List of components 14 17 Transport and storage 8 Troubleshooting 36 Basic actions 36 High room temperature 36 Ice build up in the fan grille and or fan cone 36 J SPI Inverter...

Страница 66: ......

Страница 67: ......

Страница 68: ...WS name Eva Lena WS version a1 working edition Publish date 2022 04 05 13 36 Kaukora Oy PL 21 Tuotekatu 11 212 01 Raisio 358 2 437 4600 E mail kaukora kaukora www jaspi 531786...

Отзывы: