![JAMAR Technologies TRAX Apollyon Скачать руководство пользователя страница 68](http://html2.mh-extra.com/html/jamar-technologies/trax-apollyon/trax-apollyon_user-manual_3257233068.webp)
TRAX Apollyon User’s Manual
5-16
Layout: L13
Layout Type: Traditional Road Tubes
Sensors Used: 3 Road Tubes
Spacing: Two Feet
Count Formats: Basic, Volume
Data: Volume, Gap
Channels: 3 Channels, A, B-A, C-B
This layout is the same as the L2 layout, but with the addition of a tube for
a third channel. Refer to the L2 layout for further information.
The tubes should be spaced two feet apart. For improved accuracy with
this type of data collection, we recommend that the L7 layout be used
with the Road Ramp system to isolate each lane. Visit our web site at
www.jamartech.com for more information.
26 ft.
B
TRAX
A
12 ft.
2 foot spacing
between tubes
C
24 ft.
36 ft.
Содержание TRAX Apollyon
Страница 1: ...i...
Страница 7: ...1 1 Chapter 1 Introduction to the TRAX Apollyon Chapter 1 Introduction to the TRAX Apollyon...
Страница 23: ...2 1 Operational Features of the TRAX Apollyon Chapter 2 Chapter 2 Operational Features of the TRAX Apollyon...
Страница 43: ...3 1 Chapter 3 Using the EZ Belt Using the EZ Belt Chapter 3...
Страница 47: ...4 1 Chapter 4 Road Tube Installation Chapter 4 Road Tube Installation...
Страница 53: ...5 1 Chapter 5 EZ Belt Road Tube Layouts Chapter 5 EZ Belt Road Tube Layouts...
Страница 70: ...TRAX Apollyon User s Manual 5 18...
Страница 71: ...6 1 Chapter 6 Troubleshooting FAQ Chapter 6 Troubleshooting FAQ...
Страница 75: ...A 1 Appendix Appendix...
Страница 88: ...TRAX Apollyon User s Manual A 14...