FOUNDATION DETAILS AND GUIDELINES

A. 

Ground base Foundation (RCC/PCC)

Ø

The foundation should be water leveled and at least 300mm above the 

ground level to maintain cleanliness and avoid flooding.

Ø

The length and width of the foundation should be at least 600mm to 

800 mm more than that of the DG set size i.e. 300mm on each side. 

Check the foundation level diagonally as well as across the length and 

width.

Ø

Please refer to  the foundation drawing attached herewith (page-3).

Ø

A rigid foundation ensures the least vibration. Sand Filling should be 

there around the foundation.  18mm rubber matting must be used over 

the  foundation to minimize the vibration effect and noise leakage.

Ø

Ensure that the foundation to support 1.5times of the total wet weight 

of the single generator and 2 times of the total weight for the multiple 

generators.

Ø

Please  refer  to  the  dimension  of  DG  set  for  deciding  the  foundation 

length, width and depth.  

Note:  Please  ensure  that  the  foundation  should  not  be  made  over  any   

 

basement,  water tank or Sewer Line.

B. 

Roof  top  Installation

Ø

  A  rooftop  installation  requires  proper  planning  and  the  structural 

design considerations for dynamic loading.  

Ø

The weight of Silent DG set should be on Column and Beam through 

   

proper foundation.

Ø

The  RCC  foundation  should  be  on  the  Beam  or  supported  on  two 

Beams.  

Ø

ISMC Channel or MS “I” Section may also be used to cater the load of the 

DG set with the canopy. Load of ISMC Channel or MS “I” Section should 

be on the column of the building.

Ø

M.S. Sheet is to be provided at the bottom of the base frame of the Silent 

DG set for roof top installation.

2

JAKSON & CO.

Содержание JakPower Kirloskar Koel Green EA10 G1

Страница 1: ......

Страница 2: ......

Страница 3: ...nt to Jakson care No 8800447864 General Note 1 Please always sign the report made by our Service Engineer 2 Warranty is applicable for two years for engine alternator only subject to use of Kirloskar...

Страница 4: ...SUMP CAPACITY NEPAL 11 11 ROUTINE MAINTAINANCE OF SDG SET 12 12 PRE COMMISSIONING CHECK 13 13 ROUTINE CHECK POINTS 14 14 DO S DON T S 15 15 TROUBLE SHOOTING ENGINE 16 20 16 TROUBLE SHOOTING ALTERNATOR...

Страница 5: ...be minimum 1 5 meters A low height shelter for the Silent DG Set should be avoided It should not obstruct the hot air outlet shelter height minimum 1 5 meter or equal to height of genset It is prefera...

Страница 6: ...to support 1 5times of the total wet weight of the single generator and 2 times of the total weight for the multiple generators Please refer to the dimension of DG set for deciding the foundation leng...

Страница 7: ...R CONSULTANT TABLE FOR BAR S SIZE RATING OF SLENT DG SET UP TO 82 5 KVA 100 KVA TO 200 KVA 250 KVA TO 750KVA SIZE OF BAR 10MM DIA 12MM DIA 16MM DIA FFL THERMOCOL SAND SOLD SERVICED TITLE PART NAME DRA...

Страница 8: ...eters An earth pit cover should be provided A watering pipe of 25mm with a funnel should be provided for each pit wherever depth of the earthing pit is not at water level Earthing system should be che...

Страница 9: ...s possible and load of the extended exhaust pipe silencer should not be on the engine manifold 1 If the extension of exhaust pipe is more than 5 meters above Genset increase pipe diameter by 13mm for...

Страница 10: ...omer Size of the fuel piping should be 12mm upto 250 KVA DG set B C Class M S pipe 19 mm 25mm I D is recommended For fuel piping above 250 KVA DG sets MS pipe should be used with proper welded joints...

Страница 11: ...vided by customer Note a Correct size cable glands should always be used for holding the cable b Control wiring should always be done with 2 5 sq mm copper cable For 3 Phase KVA 10 35 40 125 Al Cable...

Страница 12: ...ttery charger which is connected with 230V AC supply The Battery charger is provided with an AMF Panel Auto Mains Failure Panel under the standard scope of supply 230V AC supply is essential for batte...

Страница 13: ...om date of commissioning whichever is earlier G1 Check G2 Check within 550 hours or 13 months from date of commissioning whichever is earlier G3 Check within 1050 hours or 19 months from date of commi...

Страница 14: ...ery condition Charged Discharged 9 Battery Terminal Leans Proper damaged replaced 10 Electrolyte level High Medium Low 11 Fuel Filter water separator Proper to be replaced 12 V Belt for charging alter...

Страница 15: ...Check G2 Check after 250 hours or 3 months whichever is earlier After first service Oil change period is 500 hours or 6 months whichever is earlier If Service carried out after completion of 500 hours...

Страница 16: ...Lube oil filter cartridge Every 500 Hrs Battery and lead connections Every 50 Hrs V Belt condition and tension adjust replace if required Radiator fins depends on site condition externally Radiator tu...

Страница 17: ...e laying fitting and connection jobs are completed with proper glanding If panel is out side canopy Power Cable Control cable laying fitting connection jobs have been completed Most important Battery...

Страница 18: ...k for any leakage Check for any loose connections Check Battery condition Check Lube oil level and quality lube oil should not be very thick with visible carbon and metal particles Check electrolyte l...

Страница 19: ...tenance repairs overhauling of the genset as per recommended schedules in the user manual Call on the authorised service dealer for servicing maintenance work Please refer maintenace maual before doin...

Страница 20: ...ng Check wiring it should be as per drawing andTightened Dirty clogged air cleaner Check Vaccum indicator if red ribbon is visible then Clean air cleaner refer manual for cleaning No fuel or Low fuel...

Страница 21: ...uel Pump Contact to KOEL Service Dealer Injector needs adjustment Contact to KOEL Service Dealer Faulty governor setting Contact to manufacturer or KOEL Service Dealer Load at the time of starting Sta...

Страница 22: ...hange the lube oil as per KOEL specification Dirt choked suction tube strainer Clean the tube strainer Clogged oil passage Check and clear oil passage Contact to KEOL service dealer Radiator fins chok...

Страница 23: ...EL Service Dealer Dust entry in air inlet system Make necessary arrangement to stop dust entry without any modification in air inlet arrangement Dirt clogged air cleaner Clean air cleaner Wrong grade...

Страница 24: ...ng adjustment Contact to manufacturer or KOEL Service Dealer AVM pad broken or wrong fitment Replace if AVM Pad broken Gap between foundation and base frame i e foundation level is not proper Ensure p...

Страница 25: ...failed Replace fuses AVR Defective Replace AVR Rotating diode faulty Check rotating diodes and replace faulty diodes Prime mover Adjust prime mover Prime mover speed is low Adjust prime mover speed t...

Страница 26: ...y Coupling and foundation bolts loose Tighten the bolts Bearing defective Replace bearing Incorrect assembly of bearing Re assemble correct Bearing damaged Replace bearing Prime mover speed droop impr...

Страница 27: ...erminal 1 and 2 inside panel It should be 12 24 V If not check circuit or get the battery charged before making further attempts as battery may be weak The Engine cranks but fails to run Check the fue...

Страница 28: ...heck battery terminals They should be properly tightened and should not be corroded Check LLOP connection it should be properly connected on engine terminal Check all wiring connection should be prope...

Страница 29: ...l MCBs these should be in ON position l Check if all three phases RY YB and BR of Mains supply are available All three phases should be available and voltage should be more that the setting of mains v...

Страница 30: ...26 JAKSON CO BY KIRLOSKAR POWER JAKSON COMPANY 550 13...

Страница 31: ...27 JAKSON CO BY KIRLOSKAR POWER JAKSON COMPANY 550 13...

Страница 32: ...ge are mandatory Air Intake Exhaust system Open cylinder heads check the condition of liner piston top for rust formation any damage scratch marks foreign material entry or any abnormality and initiat...

Страница 33: ...ity as per KOEL Policy The replacement of the parts will purely be restricted to the most desired one the labour cost charged towards revalidation activity must be as per KOEL recommendation The Custo...

Страница 34: ...arcode sticker is altered or defaced in any manner whatsoever f Battery defect is caused by faulty electrical systems improper handling service by unauthorized dealers auto electricians wilful abuse d...

Страница 35: ...POWER JAKSON CO...

Страница 36: ......

Отзывы: