SELECTION OF SITE

Ø

Proper space should be there for placement and opening of doors of the  

 

Silent DG set.

Ø

There  should  be  atleast  1.5  meter  free  space  around  the  DG  set  for 

 

proper operation and maintenance.

Ø

There should be cross ventilation of air to ensure proper cooling of DG 

 

set.  Exhaust gases and hot air discharge should not re-circulate inside 

 

the acoustic enclosure (canopy). 

Ø

 

If  Genset  is  to  be  installed  in  the  room,  please  ensure  proper  cross   

 

ventilation and surrounding space.

Ø

There should be no restriction for fresh air suction and hot air discharge.  

 

If  2 nos. DG sets are installed at the site, ensure that hot air outlet of the 

 

one DG set does not become the fresh air intake of the 2nd DG set.

Ø

 

If Genset is to be installed in the basement, please ensure ventilation 

 

with respect to Air requirement and clear space for every maintenance. 

Ø

Distance between two SDG set should be minimum 1.5 meters.

Ø

A low height shelter for the Silent DG Set should be avoided. It should 

 

not obstruct the hot air outlet, shelter height minimum 1.5 meter or 

 

equal to height of genset

 

Ø

It is preferable to install the DG set in an open area.  No shade (roof)  is

 

required  over  it.    However,  if  the  AMF  Panel  is  outside  the  Acoustic   

 

Enclosure,  then a shelter  is recommended for the AMF Panel. 

Ø

For Roof Top Installation, ensure that the civil structure is capable to 

 

bear the static and dynamic load of DG set.  The load of the Silent DG set 

 

should be borne by Columns and  Beams of the building. 

Ø

Proper space should be there for Earthing.

Ø

If there are no space constraints, the DG set should be placed near the 

 

distribution panel.

Ø

The DG set should be located away from polluted surroundings such as 

 

corrosive  fumes,  cement  dust,  fibres,  cotton  and  toxic  chemicals  to 

 

avoid overheating of the  D.G. Set.

Ø

 

There should be sufficient space around the Genset to avoid resonance 

 

and echo effect which contributes to abnormal sound from Genset.

Ø

 

The space should be open without any obstacles.

1

JAKSON & CO.

Содержание JakPower Kirloskar Koel Green EA10 G1

Страница 1: ......

Страница 2: ......

Страница 3: ...nt to Jakson care No 8800447864 General Note 1 Please always sign the report made by our Service Engineer 2 Warranty is applicable for two years for engine alternator only subject to use of Kirloskar...

Страница 4: ...SUMP CAPACITY NEPAL 11 11 ROUTINE MAINTAINANCE OF SDG SET 12 12 PRE COMMISSIONING CHECK 13 13 ROUTINE CHECK POINTS 14 14 DO S DON T S 15 15 TROUBLE SHOOTING ENGINE 16 20 16 TROUBLE SHOOTING ALTERNATOR...

Страница 5: ...be minimum 1 5 meters A low height shelter for the Silent DG Set should be avoided It should not obstruct the hot air outlet shelter height minimum 1 5 meter or equal to height of genset It is prefera...

Страница 6: ...to support 1 5times of the total wet weight of the single generator and 2 times of the total weight for the multiple generators Please refer to the dimension of DG set for deciding the foundation leng...

Страница 7: ...R CONSULTANT TABLE FOR BAR S SIZE RATING OF SLENT DG SET UP TO 82 5 KVA 100 KVA TO 200 KVA 250 KVA TO 750KVA SIZE OF BAR 10MM DIA 12MM DIA 16MM DIA FFL THERMOCOL SAND SOLD SERVICED TITLE PART NAME DRA...

Страница 8: ...eters An earth pit cover should be provided A watering pipe of 25mm with a funnel should be provided for each pit wherever depth of the earthing pit is not at water level Earthing system should be che...

Страница 9: ...s possible and load of the extended exhaust pipe silencer should not be on the engine manifold 1 If the extension of exhaust pipe is more than 5 meters above Genset increase pipe diameter by 13mm for...

Страница 10: ...omer Size of the fuel piping should be 12mm upto 250 KVA DG set B C Class M S pipe 19 mm 25mm I D is recommended For fuel piping above 250 KVA DG sets MS pipe should be used with proper welded joints...

Страница 11: ...vided by customer Note a Correct size cable glands should always be used for holding the cable b Control wiring should always be done with 2 5 sq mm copper cable For 3 Phase KVA 10 35 40 125 Al Cable...

Страница 12: ...ttery charger which is connected with 230V AC supply The Battery charger is provided with an AMF Panel Auto Mains Failure Panel under the standard scope of supply 230V AC supply is essential for batte...

Страница 13: ...om date of commissioning whichever is earlier G1 Check G2 Check within 550 hours or 13 months from date of commissioning whichever is earlier G3 Check within 1050 hours or 19 months from date of commi...

Страница 14: ...ery condition Charged Discharged 9 Battery Terminal Leans Proper damaged replaced 10 Electrolyte level High Medium Low 11 Fuel Filter water separator Proper to be replaced 12 V Belt for charging alter...

Страница 15: ...Check G2 Check after 250 hours or 3 months whichever is earlier After first service Oil change period is 500 hours or 6 months whichever is earlier If Service carried out after completion of 500 hours...

Страница 16: ...Lube oil filter cartridge Every 500 Hrs Battery and lead connections Every 50 Hrs V Belt condition and tension adjust replace if required Radiator fins depends on site condition externally Radiator tu...

Страница 17: ...e laying fitting and connection jobs are completed with proper glanding If panel is out side canopy Power Cable Control cable laying fitting connection jobs have been completed Most important Battery...

Страница 18: ...k for any leakage Check for any loose connections Check Battery condition Check Lube oil level and quality lube oil should not be very thick with visible carbon and metal particles Check electrolyte l...

Страница 19: ...tenance repairs overhauling of the genset as per recommended schedules in the user manual Call on the authorised service dealer for servicing maintenance work Please refer maintenace maual before doin...

Страница 20: ...ng Check wiring it should be as per drawing andTightened Dirty clogged air cleaner Check Vaccum indicator if red ribbon is visible then Clean air cleaner refer manual for cleaning No fuel or Low fuel...

Страница 21: ...uel Pump Contact to KOEL Service Dealer Injector needs adjustment Contact to KOEL Service Dealer Faulty governor setting Contact to manufacturer or KOEL Service Dealer Load at the time of starting Sta...

Страница 22: ...hange the lube oil as per KOEL specification Dirt choked suction tube strainer Clean the tube strainer Clogged oil passage Check and clear oil passage Contact to KEOL service dealer Radiator fins chok...

Страница 23: ...EL Service Dealer Dust entry in air inlet system Make necessary arrangement to stop dust entry without any modification in air inlet arrangement Dirt clogged air cleaner Clean air cleaner Wrong grade...

Страница 24: ...ng adjustment Contact to manufacturer or KOEL Service Dealer AVM pad broken or wrong fitment Replace if AVM Pad broken Gap between foundation and base frame i e foundation level is not proper Ensure p...

Страница 25: ...failed Replace fuses AVR Defective Replace AVR Rotating diode faulty Check rotating diodes and replace faulty diodes Prime mover Adjust prime mover Prime mover speed is low Adjust prime mover speed t...

Страница 26: ...y Coupling and foundation bolts loose Tighten the bolts Bearing defective Replace bearing Incorrect assembly of bearing Re assemble correct Bearing damaged Replace bearing Prime mover speed droop impr...

Страница 27: ...erminal 1 and 2 inside panel It should be 12 24 V If not check circuit or get the battery charged before making further attempts as battery may be weak The Engine cranks but fails to run Check the fue...

Страница 28: ...heck battery terminals They should be properly tightened and should not be corroded Check LLOP connection it should be properly connected on engine terminal Check all wiring connection should be prope...

Страница 29: ...l MCBs these should be in ON position l Check if all three phases RY YB and BR of Mains supply are available All three phases should be available and voltage should be more that the setting of mains v...

Страница 30: ...26 JAKSON CO BY KIRLOSKAR POWER JAKSON COMPANY 550 13...

Страница 31: ...27 JAKSON CO BY KIRLOSKAR POWER JAKSON COMPANY 550 13...

Страница 32: ...ge are mandatory Air Intake Exhaust system Open cylinder heads check the condition of liner piston top for rust formation any damage scratch marks foreign material entry or any abnormality and initiat...

Страница 33: ...ity as per KOEL Policy The replacement of the parts will purely be restricted to the most desired one the labour cost charged towards revalidation activity must be as per KOEL recommendation The Custo...

Страница 34: ...arcode sticker is altered or defaced in any manner whatsoever f Battery defect is caused by faulty electrical systems improper handling service by unauthorized dealers auto electricians wilful abuse d...

Страница 35: ...POWER JAKSON CO...

Страница 36: ......

Отзывы: