Subfloor
Prepare the subfloor for the drain and ensure that the area is level.
1
The drain/overflow of the bathtub extends below the bottom of the bathtub. Identify the drawing in the Technical
Specifications Manual that corresponds with your bathtub.
2
Make appropriate cuts to the subfloor to accommodate the drain.
3
Jacuzzi’s Tru-Level™ base is a standard feature on all bathtubs. If the subfloor is level and a continuous surface,
no other preparation is necessary. Proceed to the “Installation” section.
4
If the subfloor is not level, you must level the entire surface prior to installing the bathtub. The materials used
will insure that the bathtub is supported from the bottom. These materials include: leveling compound, mortar,
plaster or minimal expansion structural foam (having a density of a minimum 5lbs/cubic foot). The bathtub must
remain level in order for it to drain properly and must make contact with the leveling material. Both sides of a joint
or splice of subfloor should be level to each other.
Electrical Connections
Risk of electric shock. Connect only to a circuit
protected by a GFCI.
When using electrical products, basic precautions
should always be followed:
•
Always follow local building and electrical codes.
•
Grounding is required. The unit should be
installed and grounded by a qualified electrician.
Two separate GFCI protected circuits are required. Install
a duplex outlet to the wall stud underneath the bathtub, at
least 4˝ (101mm) above the floor. The duplex outlet is not
supplied.
A separate, 120VAC, 15 Amp GFCI circuit is required for
chromatherapy lighting.
A separate, 120VAC, 15 Amp GFCI circuit is required for
the blower.
Reset
Test
2-Wall Installation
3-Wall Installation
32˝
(812mm)
3˝
(76mm)
10˝
(254mm)
32˝
(812mm)
48˝
(1219mm)
32˝
(812mm)
32˝
(812mm)
3˝
(76mm)
32˝
(812mm)
10˝
(254mm)
10˝
(254mm)
Floor Cutout for
Drain/Overflow
Floor Cutout for
Drain/Overflow
Floor Cutout for
Drain/Overflow
Floor Cutout for
Drain/Overflow
BATHTUB
CUTOUT
BATHTUB
CUTOUT
BATHTUB
CUTOUT
BATHTUB
CUTOUT
Figure 2 - Clearance Examples
48˝
(1219mm)
•
To ensure the installer has space to maneuver and
install the bathtub, allow adequate wall and ceiling
clearance (Figure 2).