Pure Air
®
Bath
Page 12
www.jacuzzi.com
Installation and Operation
English
8
Install the unit, inserting the blower end first,
lowering the bathtub into the opening as shown in
the illustration (Figure 9).
DO NOT use plumbing fixtures or lines to lower the
unit. Allow the bathtub to rest on the supports.
Drop-in Installation (con’t)
Flat Subfloor
Flat Subfloor
Scrap Lumber
Figure 11 - Support
Figure 10 - Support
Figure 9 - Drop-In (side view)
Minimum 2˝
(50mm) Max
Thickness
Tile or
Finished
Surface
Member Support
Substrate
9
Inspect all fittings, plumbing, and control
lines after inserting the bathtub to insure the
components are not damaged, disconnected, or
contacting the finish surface substrate or support
members.
10
Connect flex water supply lines to faucet and plug
power cords into GFCI outlet.
11
Remove scrap lumber and lower the bathtub fully
into the opening (Figures 10 and 11).
The bathtub must be fully supported from the
bottom. The bathtub must rest on the subfloor, or
be in contact with the leveling material.
12
Align the bathtub and connect the drain.
13
Turn on the power supply to the dedicated GFCI
protected circuits and check system operation.
14
Caulk around the perimeter of bathtub to seal
the space between the rim and the finished deck
(Figure 7 on previous page).
Uneven
Subfloor
Floating
Floor
Compound