background image

Intake Marker Chain Assembly

TOOLS REQUIRED:

Pliers

STEP 1: 

 Locate the three marker chain sets.  

These will provide the means to lowering and 

raising the intake plate level.

STEP 2:

  The marker chain has numbered 

indicators represent the depth of the intake plate 

when that numbered indicator is at water level.  

For this reason, when attaching the marker chain, 

the numbers should start highest value at the top 

and the lowest value at the bottom.  The numbers 

are indicated in feet.

STEP 3:

  Locate the very lastlink in the chain 

end having the highest numbered indicator.  Use 

a quick link to attach the link to the small hole 

located on the chain bracket.  Tighten the quick 

link using a pliers.

STEP 4: 

 Find the last link on the end having 

the lowest numbered indicator.  This link should 

attach to the welded link located directly below 

the chain bracked on the hose flange connected 

to the intake plate.  Use a quick link to make this 

attachment.  Tighten the quick link using a pliers.

STEP 5:

  Once marker chain is connected to the 

chain bracket and hose flange, pull the chain tight 

from the nose flange and slide it into the chain slot 

on the chain bracket.

STEP 6:

  Repeat steps 2 through 5 for each 

marker chain.

Quick Link connecting end of chain to

small chain bracket hole.

Weld link on hose flange connecting

opposite end of chain to hose flange.

Marker chain slipped into chain bracket slot.

Machine equpped with 3 marker chains.

© 2020 Ixom | www.medoraco.com | 866 - 437 - 8076 | [email protected]

Equipment Assembly

10155_20200529

O&M_GF10000_10492_20201020 - 19

Содержание GridBee GF10000

Страница 1: ...2020 Ixom www medoraco com 866 437 8076 info medoraco com O M_GF10000_10492_20201020 GridBee GF10000 Owner s Manual...

Страница 2: ...ewater Treatment Processes Ixom equipment continues to be at the forefront as the 1 world leader for in situ water body treatment 2020 Ixom www medoraco com 866 437 8076 info medoraco com Table of Con...

Страница 3: ...ent You can avoid hazards by following these safety instructions and applying some ordinary common sense when operating or servicing this unit Keep in mind that full operator attention and alertness a...

Страница 4: ...tative ELECTRICAL HAZARD WARNING THIS EQUIPMENT CONTAINS HIGH VOLTAGE ELECTRICAL SHOCK CAN CAUSE SERIOUS OR FATAL INJURY ONLY QUALIFIED PERSONNEL SHOULD ATTEMPT PLACEMENT OPERATION AND MAINTENANCE OF...

Страница 5: ...ly with all relative OSHA and local regulations while installing and performing any maintenance to the mixer circulation equipment Key OSHA Compliance Standards that must be followed and not limited t...

Страница 6: ...providing gentle mixing de stratification and surface renewal The GF series GridBee requires a minimal amount of AC grid power The grid provides power to the onboard AC DC power box and motor controll...

Страница 7: ...km hr wind higher than 4 ft 1 2m waves or ice thaw it is possible for the duckbill anchors to pull partly or completely out of the ground or the tether cable span across the pond to break loose from...

Страница 8: ...roller and brushless motor the two components need to be located close to one another This is the primary reason for having the motor controller located directly on the Machine All electronic connecti...

Страница 9: ...aft coupling connects the brushless motor drive shaft to the impeller shaft The shaft coupling is located directly below the brushless motor and is made up of 3 main components These components are ca...

Страница 10: ...water should freeze around the machine the freeze sleeve will stand still frozen in by the ice but inside the plastic sleeve the impeller shaft will be turning The impeller blades are welded to a hub...

Страница 11: ...tering the machine and the upper water layer leaving the dish The top lip of the distributor dish is set from 3 4 inch to 2 5 inches 2 cm to 6 4 cm Please refer to the table below for exact settings b...

Страница 12: ...haped bend at the bottom so that the strainer does not draw sediment up from the bottom The strainer has a chain connected to it and can be chained up at more shallow depths if necessary The chain als...

Страница 13: ...nts without being damaged The turnbuckle is self locking Simply rotate the handle to expand or collapse the turnbuckle for dish depth adjustment It is important to check the distributor dish depth rou...

Страница 14: ...lyethylene The floats are filled with a Polystyrene closed cell foam for long term buoyancy The floats have a uniquely designed shape to Minimize the interference with the water flow on the surface co...

Страница 15: ...ise the float up fitting it into the float arm Use the float pins to secure the float to the float arm STEP 5 Place hairpins in each float pin to secure it and prevent the pin from coming out STEP 6 R...

Страница 16: ...DURING FINAL SETTINGS AND UNIT WOULD HAVE TO BE PULLED BACK OUT OF THE WATER CORRECTED AND RE INSTALLED SB10000 WITH 15FT 4 5m OR LESS HOSE SB 7500 20FT 4 5m OR LESS HOSE ALL SB5000 ALL SB2500 ALL PO...

Страница 17: ...y STEP 3 Take the float arm and slip the narrow end with Float Arm Stems around the core unit leg Align the holes through the Float Arm Stems with the correct float arm connection hole determined from...

Страница 18: ...t of the turnbuckle assembly is in place take the opposite end of the turnbuckle and slide it into the float arm assembly as shown in picture STEP 5 Align the hole through the shaft with the float arm...

Страница 19: ...dish STEP 3 Place one of the chain brackets over the square tubing with the wider side facing up and the opening facing outward STEP 4 Once the chain bracket is slid around the square tubing insert t...

Страница 20: ...4 Fasten the leg extension to the Core unit assembly using a set of two 5 16 inch x 2 inch 8mm x 51mm clevis pins STEP 5 Secure both pins using two hair pins STEP 6 Repeat steps 2 through 5 for each...

Страница 21: ...sing a pliers STEP 4 Find the last link on the end having the lowest numbered indicator This link should attach to the welded link located directly below the chain bracked on the hose flange connected...

Страница 22: ...s first every time the Machine is inspected or having maintenance procedures performed It is strongly encouraged that anyone working on or near the machine follow these rules Wear a personal floatatio...

Страница 23: ...g a three point rigging system connect to all three rigging points of the Machine Hoist the Machine by the three rigging points and slowly lower into the reservoir STEP 3 Tie as much of the hose up as...

Страница 24: ...of a nickel or locating the notch on each chain bracket for machines having a hose If using the notch on each chain bracket the water level should be even with the appropriate notch see picture STEP 3...

Страница 25: ...l to 1 minute and at least 20 seconds This step is easier with two people one counting revolutions and the other keeping track of the time expired STEP 3 Quit counting revolutions and immediately obse...

Страница 26: ...revent it from going through Machine again Follow all local laws and regulations when disposing of any materials collected STEP 4 Observe if there is buildup below the impeller blades If below the imp...

Страница 27: ...again Follow all local laws and regulations when disposing of any materials collected STEP 5 Once clean place impeller assembly back in place Slide lower coupling into upper coupling and allow to dro...

Страница 28: ...ECTRICAL CONNECTION GRID POWER ONLY 120VAC 60HZ 2 0 AMPS MOTOR CONTROLLER BRUSHLESS DC MOTOR 2020 Ixom www medoraco com 866 437 8076 info medoraco com Electrical Electrical Overview GF Series Large Fr...

Страница 29: ...se coupling Wiring Controls Includes power box which converts 120VAC to low voltage DC power Includes submersible SOOW type cable with inhibitors for UV protection SCADA accessory compatible Rotating...

Страница 30: ...ID AC POWER OFF BEFORE ENTERING ENCLOSURE GRIDBEE STRONGLY RECOMMENDS THAT AN ELECTRICIAN INSTALL A BREAKER SWITCH OR OTHER TYPE OF SWITCH THAT WOULD DISCONNECT AC POWER GOING INTO THE ELECTRONIC CONT...

Страница 31: ...tmeter is available the motor circuit voltage can be measured off terminal blocks 1 and 2 The proper motor voltage should be approximately 45vDC Brain Board voltage should be approximately 12vDC and c...

Страница 32: ...DC POWER SUPPLY LED SOLID GREEN LIT SOLID GREEN NOT LIT ERROR CODES 12 VDC ON 12 VDC OFF 12 VDC POWER SUPPLY LED SOLID GREEN LIT SOLID GREEN NOT LIT Source Power Circuit 120 VAC Control Circuit 12 VDC...

Страница 33: ...10100 Float 05 PN 18265000 Turnbuckle Assembly 06 PN 100161 Control Box 07 PN 14013022 Motor Control Cord 08 PN 20014500 14 Brushless Motor 09 PN 26023610 36 x 10 Hose 10 PN 26128000 Intake Plate 01 1...

Страница 34: ...2020 Ixom www medoraco com 866 437 8076 info medoraco com Dimension Drawing GF10000 1532_10494_20200526 O M_GF10000_10492_20201020 32...

Страница 35: ...tear If the factory s service crews performed the original on site placement and startup then this warranty also includes labor Where labor is included in lieu of sending a factory service crew to th...

Страница 36: ...and other related subjects as required by OSHA to perform the necessary work to install or remove SolarBee and GridBee equipment and are knowlegeable in the regulations and standards of OSHA If you f...

Отзывы: