29
In
stal
lat
ion
Wiring
Wiring
Wiring for power voltage, earthing and external signals.
Points to be observed
Observe the following points during wiring work.
•
Electrical work should be performed by a qualified electrician. Always observe applica
-
ble codes or regulations.
•
Do not apply power other than that specified on the nameplate. Otherwise, failure or fire
may result.
•
Do not perform wiring work while electric power is on. Otherwise, an electrical shock or
a short circuit may result. Be sure to turn off the power before wiring work.
•
Be careful for electric power not to be turned on during work.
•
Replacement of a power cable should be conducted by a manufacturer, his agency or a
skilled person. Otherwise, an accident may result.
End terminals
See the following diagram for detail.
AUX IN/Analog OUT
STOP IN
Alarm OUT
EXT IN
Fieldbus
Power cable (1950mm)