18
Step 5:
Close the covering hood.
Once all cables are properly connected to the furnace base, close the
covering hood over the connections.
Step 7:
Establish additional connections.
Connecting the power
Please make sure that the voltage indicated on the rating plate
complies with the local power supply. Subsequently, connect the
power cord with the power socket of the furnace.
The furnace must only be operated with the supplied
power cord!
Connecting the vacuum pump
Connect the vacuum pump plug with the vacuum pump socket.
We recommend using only a vacuum pump from Ivoclar Vivadent
(VP4 / VP5), since these pumps are especially coordinated with the
press furnace.
If other pumps are used, please observe and do not exceed the
maximum power consumption.
Do not shorten the vacuum hose! The minimum length of
the vacuum hose is 1.6 m.
Step 6:
Mount the connection cover.
Mount the connection cover and secure it with the fastening screw.
Make sure that the lateral catch springs snap into place when
mounting the connection cover.
The furnace must only be operated with the covering
hood closed and the connection cover mounted!
4. Installation and Initial Start-Up
26
25
29
30
32
33
Creating a LAN connection
In order to use the IoT function, you need a LAN connection to your
web-enabled local PC network. Use the LAN network cable included
in the delivery for this purpose. Connect one plug to the ethernet
port (15) and the other one to the router (RJ45).