Section 1, Overview
International Thermal Research
1-5
1.4 Critical Factors
THE INSTALLATION SHALL BE IN ACCORDANCE WITH THE
REGULATIONS OF AUTHORITIES HAVING JURISDICTION
The key factors to keep in mind when planning and installing
the heater are:
·
Location restrictions for the heater, electrical control box,
and exhaust outlet (to reduce noise, vibration, heat loss,
etc.)
·
Length, routing, and sizing of the hot fluid lines, fuel
lines, air-inlet venting and tubing, exhaust piping, and wiring
·
Outside air - direct, unrestricted air intake requires a
draw of outside air for combustion
·
Ability to easily access and service the product, especially
fuel, plumbing, and electrical systems
·
After installation, ability to purge water and fuel lines and
inspect/test entire system using the ITR-supplied Inspection
Check Sheet.
1.5 Equipment, Tools, and Skills
As the user and/or installer, you must be qualified and
authorized to do the installation, which requires mechanical
aptitude and electrical knowledge. Make sure you comply
with existing ABYC industry practices, using the highest and
most recent standards and codes. Good workmanship is
essential. Refer to Section 1 – Overview, sub-Section 1.2,
Protect Your Warranty.
You will need the following equipment and tools (not
supplied) to install the heating system. This does not include
optional equipment and accessories:
·
Standard tools normally available in a well-equipped shop
·
Approved fasteners (used with the supplied mounting
hardware) for securely mounting the heater.
·
Stainless Steel 1½” ID exhaust piping no longer than 12’
with no bends (see Section 3 – Installing the Exhaust
System, for details when bends are present).
·
2” combustion fan intake hose, though-hull adapter and
clamps
Please pay attention
to notices of
“Danger” “Warning”
“Caution” and
“Notice” in this
manual.
Содержание Hurricane Zephyr HW
Страница 14: ...Section 1 Overview 1 8 Installation Manual for Hurricane Zephyr HW Heating System...
Страница 20: ...Section 2 Mounting the Heater Unit 2 6 Installation Manual for Hurricane Zephyr HW Heating...
Страница 28: ...Section 4 Installing the Fuel System 4 4 Installation Manual for Hurricane Zephyr HW Heating System...
Страница 34: ...Section 5 Installing Fan Heaters 5 6 Installation Manual for Hurricane Zephyr HW Heating System...
Страница 43: ...Section 6 Wiring the Electrical System International Thermal Research 6 9...
Страница 83: ...Section 11 Maintenance 11 6 Installation Manual for Hurricane Zephyr HW Heating System...
Страница 88: ...International Thermal Research Warranty Information International Thermal Research Page 5...
Страница 89: ...Warranty Information International Thermal Research Page 6 International Thermal Research...