6.- START UP AND REGULATION
STAND
: Check that the pump is properly installed in its stand.
OIL
: Take off re-filling lid and fill the pump with the provided oil: SAE
80 W 90 or equivalent. If the pump has several modules oil must be
spread to all filling holes.
CHECKING OF HYDRAULIC CIRCUIT
: Check that all valves are
opened and that escapes from priming valves derive the liquid to a
proper receptacle.
ROTARY DIRECTION
: Start up the pump to check that the rotary
direction coincides with the one shown by the arrow. To change rotary
direction invert two phases in the motor terminals box.
CHECKING OF PUMP
: Check visually/auditorilly the proper working
of the pump.
PRIMING:
To prime the pump easily, especially for not very important
flows and we if do not have priming valve, we suggest to lower
pressure up to the minimum injection point. If that is not possible, fill
up the cylinder and the suction pipe with liquid..
OVER-PRESSURE PROTECTION
: Adjust the safety valve over-
pressure or relief to the wished pressure to protect the installation
without exceeding the pump nominal pressure.
ELECTRIC PROTECTION
: Adjust the electric dispositive of electric
protection to the motor nominal current
14
6.- START UP AND REGULATION
STAND
: Check that the pump is properly installed in its stand.
OIL
: Take off re-filling lid and fill the pump with the provided oil: SAE
80 W 90 or equivalent. If the pump has several modules oil must be
spread to all filling holes.
CHECKING OF HYDRAULIC CIRCUIT
: Check that all valves are
opened and that escapes from priming valves derive the liquid to a
proper receptacle.
ROTARY DIRECTION
: Start up the pump to check that the rotary
direction coincides with the one shown by the arrow. To change rotary
direction invert two phases in the motor terminals box.
CHECKING OF PUMP
: Check visually/auditorilly the proper working
of the pump.
PRIMING:
To prime the pump easily, especially for not very important
flows and we if do not have priming valve, we suggest to lower
pressure up to the minimum injection point. If that is not possible, fill
up the cylinder and the suction pipe with liquid..
OVER-PRESSURE PROTECTION
: Adjust the safety valve over-
pressure or relief to the wished pressure to protect the installation
without exceeding the pump nominal pressure.
ELECTRIC PROTECTION
: Adjust the electric dispositive of electric
protection to the motor nominal current