MEASUREMENT AND ASSEMBLY MANUAL
Validity of the manual: 1. 6. 2017
2
HR7:
HR8-ZIP:
fig. 1
Final width B = the distance between the end brackets.
Final height H = the height including box and guide rail ends (thickness = 2 mm) except the mounting bracket.
Note: the final height H with steel cable from the top edge of the box to the lower side of the bottom rail.
2.3. DRILL THE HOLE FOR THE LEAD-THROUGH
Measure the position of the control lead-through on the screen box. Mark this on the window frame.
Drill the hole for the control lead-through through the window frame:
For motorised operation use a 10 mm drill bit; see fig. 3 on page 3.
For crank handle operation use a 14 mm drill bit; see fig. 2 on page 3.
For exterior crank handle operation with eye you do not have to drill a lead-though.
Attention! Do not drill into the window glass.