MEASUREMENT AND ASSEMBLY MANUAL
Validity of the manual: 1. 6. 2017
16
3. GENERAL INFORMATION
3.1. CHECKING THE INSTALLATION
The installation is checked by testing its functionality. The screen is lowered and raised again. This should proceed
smoothly, and no creases should develop during lowering.
3.2. MOUNTING THE BOX
This can be done in several ways:
Secure the box by hanging it from the mounting brackets (see method 1), or
- Open the box. Remove the fabric roll from the box by tapping upwards on the fabric roll so the end pops out of the
click-in retainer. Affix the box to the mounting surface with the extra pan head screws (through the back or the top of
the box). Do this for each console and in the centre. Re-install the fabric roll and the box cover.
3.3. FINISHING
Space between screen box and wall
Apply a small amount of silicon caulk in the gap between the screen box and mounting surface in order to prevent any
potential movement.
To fill the gaps at the top and the sides (between the screen box and the mounting surface when mounting brackets
are used), you can use joint sealing strip or the special U-profile (see points G3 and G4) which is available separately..
Space between guide rails and wall
Apply a small amount of silicon caulk in the gap between the guide rails and mounting surface in order to prevent any
potential movement.
DVC/DVS
When installing DVC/DVS linked screens, it is recommended that one person be available to push each guide rail onto
the console pivot, the bottom slat into the guide rail and the zipper into the grey U-shaped part of the plastic guide
profile.
4. INSTALLATION OF CONTROLS
4.1. ELECTRICAL CONNECTIONS
Note
: The connections must be made by a qualified installer (refer to guarantee card 2.1). Electrical installation and
connection diagrams must be followed correctly. The electrical accessories employed must comply with the current
standards and/or requirements.