![Isotech TWIST Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/isotech/twist/twist_user-manual_2093586022.webp)
22
Preparation for the input of
the electrical connections
4 points provided for mechanical fixing
Central structure
points for anchoring to the cei-
ling of the central structure
Before completing the fixing, it is necessary to position the electrical connections in correspondence with the terminal
blocks provided on the back.
6 )
After fixing the central part to the ceiling, proceed with the electrical connection between the control console and the
Twist module, using the flying terminal blocks and respecting the numbers shown in the wiring diagrams and in the cables
coming out from the back of the equipment
7 )
Then proceed with the assembly of the side frames by retracing points
2) - 3) - 4)
backwards.
flying terminal blocks for electrical connec-
tions between the twist module and the con-
trol console
Compartment for posi-
tioning the connections
Side frames
frame finishing covers