WARNING!!  Other pcb Jumper placements 

Jumpers at JP 1, JP 4 and JP 5 are factory placed in order to configure the circuit board to specific functions for the 
Controller.  Removal and/or re-placement may cause the unit to malfunction. 
 
 
 
  

Figure 1: 

Utilized when two (2) supply solenoids 
are provided without drain-down valves. 
Connect both supply valves to pins 4 & 5. 
  

or 

 
Utilize when one (1) supply and one (1) 
drain-down solenoid is provided. 
Connect supply valve to pins 4 & 5. 
Connect drain-down to pins 6 & 7. 
 
  

Figure 2: 

Utilized when two (2) supply solenoids are 
provided with two (2) drain-down valves. 
Connect both supply valves to pins 4 & 5. 
 And both drain-down valves to pins 6 & 7. 
 
 
 
  

Monitoring Circuit- JP3 

Output Configuration Jumpers 
@ Panic Output 
1 jumper across center two posts  
                 = dry-contact. 
 
2 jumpers across each pair of posts  
                = 24-vac output 

  

Содержание DLA Series Style 2

Страница 1: ...esting Labs Style 2 W Ver 4 41 pcb Pulse Relay pcb s Installation Operations Start up and Maintenance Instructions Table of Contents Page Warranty 2 Enclosure Specifications and Dimensions 3 Styles 3...

Страница 2: ...period of two years from date of installation when installation complies with all start up and routine maintenance procedures and Start up has been performed by an authorized factory representative R...

Страница 3: ...owder coated sheet metal 6 0 X 14 25 X 4 0 all dimensions are in inches Style Output Circuits Trans former Switch Breaker pcb Fuse 1 Output Rating standard Pulse Output DLA 2 1 24 vac 2 amp 5 amp 2 am...

Страница 4: ...ening From within the cabinet fit into opening and fasten unit to back of casework Face of wall box should be even with face of cabinet After mounting unit protect interior of box from construction de...

Страница 5: ...valves Connect both supply valves to pins 4 5 or Utilize when one 1 supply and one 1 drain down solenoid is provided Connect supply valve to pins 4 5 Connect drain down to pins 6 7 Figure 2 Utilized...

Страница 6: ...n counter clockwise the two retaining clips at the top of the Panel and open Insert plug onto circuit header on PCB Turn Power ON Close the panel and lock CAUTION Do not install the panel until all wa...

Страница 7: ...he piping system continues to function properly If you have any questions regarding the operation and maintenance of the DLA Controller please contact an ISIMET Service Representative The enclosure ha...