
17
isel
-flat bed installation GFV
Exhaust system
For an exhaust system, a suction tube with a
connecting piece for the standard diameters 32, 35
and 38 mm is pre-installed. Connect a vacuum
cleaner here.
The other end of the suction tube ends at the Z-
axis. You can connect a exhausting device here.
For the Kress processing machine (900 W), an
exhaust system is available.
Spraying/cooling device
The spraying/cooling device is pre-installed ex works. You need only to apply the
refrigerant. The compressed air is enabled by the maintenance unit for compressed air.
The entrance air pressure of the maintenance unit can be 4 to 10 bars. The maximum
permissible pressure of the spraying device is 7 bars. Partially, the working pressure is far
below.
Tool changer
The tool changer (with 4, 5 and/or 10 tool
positions) is connected ex works and ready for
immediate use.
The working pressure is approx. 8 bars.
Compressed air must be supplied via the
maintenance unit.
Consider the ITC commissioning manual
(isel tool change).
The length sensor (optional) for the tool
changer is mounted at the front to the right
beside the clamping plate.
Содержание GFV 102/62
Страница 22: ...22 isel flat bed installation GFV 11 Appendix ...
Страница 23: ...23 isel flat bed installation GFV ...