18
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Figure 21 - ML300 Baffle Boards Installed
Back Baffle Board
Front Baffle Board
Montlake™ ML300
BRICK AND BAFFLE INSTALLATION
19-A
21-A
22-A
24-A
23-A
12
A
11
A
9
A
8
A
1-A
2-A
3-A
4-A 14
A
15
A
17
A
18
A
16-A
13-A
6-A
5-A
7-A
10-A
26-A
25-A
20-A
CAUTION: Wear gloves during brick installation in case of sharp
edges inside the stove.
WARNING: IF THE BRICKS ARE NOT INSTALLED EXACTLY AS
SHOWN BELOW, THEY COULD FALL OUT OF PLACE DURING
REFUELING OR BURNING OF THE STOVE CAUSING SERIOUS
INJURY.
Firebox Brick Layout as
Viewed from the Front
Figure 17 - ML300 Brick Diagram
Letter A Brick Are Full Size
9” (229mm) Long x
4-1/2” (114mm) Wide x
1-5/16” (33mm) Thick
1. Install brick #1-6 in the numbered sequence shown in Figure 17.
2. Install rear brick support which is included in the firebox on top of
#5 and #6 brick. This support will be locked into place when the
remainder of side brick are installed.
3. Install remaining brick #7-26 in the numbered sequence shown in
Figure 17.
4. Once all the bricks are installed confirm that the already installed baffle
boards are in there correct location and resting on the secondary
burn tubes.
Figure 22 - ML300 Baffle Boards
8.741
17.870
8.741”
(222mm)
17.870”
(454mm)
Front and Back
Baffle Board