17
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Planning Installation
Safety and General
Installation
Operation
Maintenance
Troubleshooting
Parts / Accessories
Installation
CAUTION: Wear gloves during brick installation in case of sharp
edges inside the stove or insert.
WARNING: IF THE BRICKS ARE NOT INSTALLED EXACTLY AS
SHOWN BELOW, THEY COULD FALL OUT OF PLACE DURING
REFUELING OR BURNING OF THE STOVE OR INSERT CAUS-
ING SERIOUS INJURY.
Firebox Brick Layout as
Viewed from the Front
Figure 17 - ML230 Brick
Figure 18 - ML230 Baffle Boards Installed
Figure 19 - ML230 Baffle Boards
Letter A Brick Are Full Size
9” (229mm) Long x
4-1/2” (114mm) Wide x
1-5/16” (33mm) Thick
6.5
7.7
Back Baffle Board
Back Baffle Board
7.7”
(196mm)
6.5”
(165mm)
Front Baffle Board
Front Baffle Board
1. Install firebox bottom brick spacers on both the left and right side of
firebox. The brick spacers are located in the package with the manual.
Assure that brick spacers are pushed to each side until they are in
full contact with the firebox side on each side.
NOTE:
Your brick spacers may already be welded in place.
2. Install brick #1-20 in the numbered sequence shown in Figure 17.
3. Brick’s 13 and 14 will be located between the steel firebox and rear
baffle board (already installed).
4. Once all bricks are installed confirm that the already installed baffle
boards are in there correct location and resting on the secondary
burn tubes.
8-A
4-A
2-A
1-A
3-A
5-A
6-A
7-A
18-A
14-A
13-A
15-A
16-A
17-A
19-A
20-A
11-A
12-A
10-A
9-A
Montlake™ ML230
BRICK AND BAFFLE INSTALLATION