9
3.0 OPERATION
Start up and Adjustment of the Pump
(Refer figure 2, page 7)
Ensure that installation is fully completed before proceeding to start up operations.
1.
Ensure that the air control valve (K) is closed. Open the bleed-type master air valves
(D). Connect the quick disconnect coupler to the male fitting.
2.
Into a grounded metal container, open the dispensing valve (G) slowly. Ensure metal-to-
metal contact between the container and the valve.
3.
Adjust the pump air control valve (K) slowly for pressure just enough to start running the
pump. This is to prime all air within the system. After all the air has been expelled from
the lines, close the dispensing valve. During the priming of the pump, the pump runs
when the dispensing valve is opened and stop when the valve is closed.
4.
Turn the air regulator slowly until sufficient flow from the dispensing valve is achieved.
Remember to run the pump always at the lowest possible speed necessary to achieve
what is desired. Never exceed the maximum working pressure of any component in the
system.
5.
The pump should not be left to run dry of the fluid being pumped. When running empty,
the pump speed will become very fast and probably cause damage. During operation,
should the pump be found to run too fast, stop it immediately and check the fluid supply.
Is the fluid level in the drum too low or empty? If air has gone into the system, do a
priming procedure. Ensure that all air has been expelled from the lines before beginning
operations again. Flush the pump or leave it filled with a compatible solvent when not in
use.
6.
Always follow the Pressure Relief Procedure should the pump be put away for any
period of time or during system shut off at the end of the day.
Daily Maintenance Check
1.
Ensure sufficient lubricant in the air lubricator.
2.
Drain the moisture trapped in the air pressure regulator.
Clean and flush the pump thoroughly with care and appropriate cleaning fluid to obtain
maximum service life of the equipment.
Procedure For Pressure Relief
In order to avoid the risk of serious bodily injury such as spraying fluid on the skin or in the
eyes, or risk of injury from the moving part, the following procedure should be used. This
procedure should be used when shutting down the pump, servicing or repairing the pump or
any part of the system, replacing or cleaning components, or if the pumping of fluid has
stopped.
1. Close the air valve (D) of the pump.
2. Use the air bleed down valve (see installation instructions) to relieve the air
pressure in the system.
Содержание IP-02S
Страница 19: ...19 5 3 Parts drawing for IP 02 Fluid Section for C Steel Drum Length ...
Страница 21: ...21 5 5 Parts drawing for IP 02SST Fluid Section for S Steel Drum Length ...
Страница 23: ...23 5 7 Parts drawing for IP 02S Fluid Section for C Steel Stubby ...
Страница 25: ...25 5 9 Parts drawing for IP 02S SST Fluid Section S Steel Stubby ...
Страница 30: ...30 ...