![INVENTOR ICI-12 Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/inventor/ici-12/ici-12_owners-manual_2084043042.webp)
☆
The drilling of holes in the ceiling must be done by the professional personnel.
(160)
Ceiling
Installation stands for main body of the unit
Above 20
Fig 1
Notes:
The dimension for the ceiling openings with * marks can be as large as 910mm. But the
overlapping sections of the ceiling and the decorated surface boards should be maintained at no
less than 20mm
.
E
、
Main body of hoisting air conditioner
[
Fix the hoisting stand firmly
]
Water lever
Tighten (double nuts)
Bolt of one of the angle of outlet pipe is fix
on the angle of the drainage slot
[
Fix the install cardboard
]
[
Fix the gasket firmly
]
Polyethylene pipe
Bolt
(
attachment
)
Center of the ceiling
opening
Bolt
(
attachment
)
Install cardboard
Gasket anchor board
(attachment)
Nut (supplied at scene)
Hoisting stand
Gasket (attachment)
Insert
Fig.2
1
、
The primary step for install the indoor unit.
☆
When attach the hoisting stand on hoisting screw, do use nut and gasket individually at the upper
and lower of the hoisting stand to fix it. The use of gasket anchor board can prevent gasket break
off.
2
、
Use install cardboard
40
Содержание ICI-12
Страница 1: ...66129903850 ICI 18 ICI 24 ICI 36 ICI 45 ICI 50 Casette Unit ICI 12...
Страница 3: ...1 Names and functions of parts 1 ULS 12 ULS 18 ULS 24 ICI 18 ICI 24 ICI 12...
Страница 4: ...2 ULS 36 ICI 36 ULT 36 ICI 36 ULT 45 ICI 45 ULT 50 ICI 50...
Страница 22: ...TIMER operation procedure 20...
Страница 24: ...How to inser t batteries 22...
Страница 35: ...6 Optimum operation 33...
Страница 37: ...The following are not troubles 35...
Страница 38: ...8 Installation notes This should be done by professional 36...
Страница 39: ...9 Care and maintenance Please cut off the power supply after you used the air conditioner 37...
Страница 63: ......