Y
0°
Y
0°
20
INSTALLATION AND ASSEMBLY
Ventilation device iV14-MaxAir
•
Installation and operating instructions
Using the Simplex wall installation system
Requirements:
The building project is in the shell construction phase.
►
Insert the Simplex wall installation system
into the masonry at the appropriate point.
Observe
the installation markings on/in the wall
sleeve (red arrow): The integrated slope is directed
towards the exterior wall to ensure that any
condensate that may form can drain away.
►
Build the installation block into the masonry.
►
Apply insulation, plaster and render.
4.3
Installing the fan BUS
Principle sketches for the cabling of the ventilation devices:
One after the other:
►
Shorten the wall sleeve on the exterior wall
with a projection Y (
4.4).
►
Install the fan BUS (
4.3).
►
Continue with the installation of the weather
protection hood (
4.5).
Star-shaped:
Switching power
supply unit
Switching power
supply unit
Control unit
Control unit
Terminal
blocks
Ventilation devices
Ventilation
devices
Operated in pairs
Operated in pairs
Operated in pairs
Operated in pairs
The Simplex wall installation system is installed.
Cable type LiYY, 3-wire, length see
Controller
Cable type LiYY, 3-wire, max 33 m