![Intracom WiBAS Connect Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/intracom/wibas-connect/wibas-connect_commissioning-manual_2081786051.webp)
WiBAS OSDR-Hub & Terminal Station / WiBAS-Connect Terminal Station
Start Up & Commissioning Manual - Edition 5.1
51
WiBAS-OSDR TS
,
Continued
Procedure for WiBAS-OSDR TS with Panel Antenna
, continued
Step
Action
3
Perform fine alignment, as follows:
•
Use the allen key to loosen the azimuth adjustment bolt
(A)
. Perform azimuth
adjustment by moving very slowly the whole system (within the
±
10
o
range around
the azimuth axis)
until the voltage readout reaches a desired level.
•
Use the allenr key to loosen the elevation adjustment bolt
(E)
. Perform elevation
adjustment by moving very slowly the whole system (within the
±
10
o
range around
the elevation axis) until the voltage readout reaches a desired value.
The RSSI voltage
(actually the voltmeter value)
provides a direct
relationship with RSL.
For
WiBAS-OSDR
see
WiBAS-OSDR terminal station RSSI measurement
For
WiBAS-Connect
see
WiBAS-Connect terminal station RSSI
measurement calculation formula
on page
4
Use the adjustable torque wrench for pre-tightening.
The final tightening torque
will be applied after alignment process completion.
Continued on next page