![Interlogix UltraView PTZ Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/interlogix/ultraview-ptz/ultraview-ptz_installation-manual_2077199035.webp)
Chapter 3
Wiring
25
3. Connect the facility power cable (
Figure 22
). Use the provided 2-pin power terminal strip. If you are
using a heavier gauge cable, ensure that it is properly seated in the connector.
Figure 22.Power connection
When power is received by the housing board through the power connection, the housing board’s
diagnostic power LED will appear orange.
Power LED
Power connector
Содержание UltraView PTZ
Страница 1: ...UltraView PTZ Installation Manual...
Страница 6: ...UltraView PTZ Installation Manual vi...
Страница 10: ...UltraView PTZ Installation Manual x...
Страница 18: ...UltraView PTZ Installation Manual 8...
Страница 46: ...UltraView PTZ Installation Manual 36...
Страница 60: ...UltraView PTZ Installation Manual 50...