![Interlogix UltraView PTZ Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/interlogix/ultraview-ptz/ultraview-ptz_installation-manual_2077199034.webp)
UltraViews PTZ
Installation Manual
24
Wiring the housing board
To wire the housing board, do the following:
1. Connect the facility data cables to the main connections, which are the B and A terminals on the
provided 6-pin or 2-pin terminal strip (
Figure 20
). The main data connections on the terminal strip are
for control wires that are coming in from the keypad. You may also daisy-chain the data signal to
additional domes.
Note:
If you are installing RS-485 data, float the shield at the dome and connect it at the keypad.
Figure 20.Data connections
2. Connect the facility video cable (
Figure 21
).
Note:
Use only crimp-on BNC connectors. Do not use screw-on connectors.
Figure 21.Video connection
If you are installing UTP video, use the UTP terminals on the six-pin terminal strip (
Figure 20
). It provides
connections for UTP video. If you are installing coaxial video, locate the BNC connector (
Figure 17
).
Note:
UTP, which is polarity sensitive, is only available on UPIB modules with a six-pin connector.
WARNING:
Do not run any cables next to the heaters. Doing so could damage the dome or cause an electrical fire.
B A B A
UTP-
UTP+
Primary A
RS-422/485 +
Auxiliary B
RS-485 –
Primary B
RS-422/485 –
Auxiliary A
RS-485 +
Daisy chain
Video UTP
+ and -
Coaxial video
BNC
Содержание UltraView PTZ
Страница 1: ...UltraView PTZ Installation Manual...
Страница 6: ...UltraView PTZ Installation Manual vi...
Страница 10: ...UltraView PTZ Installation Manual x...
Страница 18: ...UltraView PTZ Installation Manual 8...
Страница 46: ...UltraView PTZ Installation Manual 36...
Страница 60: ...UltraView PTZ Installation Manual 50...