Chapter 6 - GLZ Graphics 73
4.
Install the new board into the same slot from which the other board
was removed.
5.
Secure the board to the chassis using the screw removed previously.
6.
If a dual-screen option is installed, reconnect the clock sync cable.
Note:
The clock sync cable is keyed so that it can be installed in only one
orientation.
7.
Close the base unit.
GLZ1T and GLZ5
GLZ1T and GLZ5 consist of two boards permanently joined into one
module, which must be removed as one unit. GLZ5 includes a Geometry
Accelerator board installed in PCI slot 1. Refer to the following figure.
GLZ1T Module
Screws
Содержание TDZ-300
Страница 1: ...TDZ 300 TDZ 400 Desktop Setup and Maintenance Guide March 1996 ...
Страница 8: ...viii Preface Returned Goods Authorization RGA Form Warranty Procedure Repair Depot Address Labels ...
Страница 28: ...14 Chapter 1 Getting Started ...
Страница 38: ...24 Chapter 2 Configuring the System 10 In the TCP IP Configuration dialog select OK 11 Restart the system ...
Страница 44: ...30 Chapter 3 Opening and Closing the Base Unit ...
Страница 68: ...54 Chapter 4 Maintaining the System ...
Страница 84: ...70 Chapter 5 Upgrading the System ...
Страница 110: ...96 Chapter 8 Troubleshooting ...
Страница 132: ...118 Appendix B Hardware Information ...
Страница 136: ......