26 Chapter 3 - Opening and Closing the Base Unit
2.
Lift up the top cover above the ISA I/O panel and pull up and back.
3.
Set the top cover aside. The following figure shows inside the base
unit.
Peripheral
Brace
Riser Card
Combo
Drive
System
Board
Auxiliary Disk
Drive Bracket
Memory Sockets
CD-ROM
Drive
SCSI Terminator
Card
Power Supply
4.
Take precautions to avoid electrostatic discharge, as described in the
next section, whenever the base unit is open.
Avoiding Electrostatic Discharge
Some of the sensitive components inside the base unit can be damaged by
static electricity. To minimize this possibility, take the following
precautions when working with the internal components of the system to
avoid electrostatic discharge.
♦
Touch the bare metal of the base unit to discharge any accumulated
electrostatic charge.
Содержание TDZ-300
Страница 1: ...TDZ 300 TDZ 400 Desktop Setup and Maintenance Guide March 1996 ...
Страница 8: ...viii Preface Returned Goods Authorization RGA Form Warranty Procedure Repair Depot Address Labels ...
Страница 28: ...14 Chapter 1 Getting Started ...
Страница 38: ...24 Chapter 2 Configuring the System 10 In the TCP IP Configuration dialog select OK 11 Restart the system ...
Страница 44: ...30 Chapter 3 Opening and Closing the Base Unit ...
Страница 68: ...54 Chapter 4 Maintaining the System ...
Страница 84: ...70 Chapter 5 Upgrading the System ...
Страница 110: ...96 Chapter 8 Troubleshooting ...
Страница 132: ...118 Appendix B Hardware Information ...
Страница 136: ......