71
Chapter 6
GLZ Graphics
This chapter provides instructions to replace graphics boards in the desktop
workstation, and to install dual-screen upgrades.
Open and close the base unit, take precautions against electrostatic
discharge, and attach an antistatic wrist strap as described in Chapter 3,
“Opening and Closing the Base Unit,” before replacing graphics boards or
installing a dual-screen upgrade.
Replacing Graphics Boards
The following table shows the graphics boards for each GLZ option installed
in the system’s PCI slots, including dual-screen configurations (DS) and the
Geometry Accelerator board (GA).
Graphics
Slot 3 (Bottom)
Slot 2
(Middle)
Slot 1 (Top)
GLZ1
GLZ1
GLZ1 DS
GLZ1
GLZ1
GLZ1T
GLZ1T
GLZ2
GLZ2
GLZ3
GLZ3
GA
GLZ5
GLZ5
GA
Содержание TDZ-300
Страница 1: ...TDZ 300 TDZ 400 Desktop Setup and Maintenance Guide March 1996 ...
Страница 8: ...viii Preface Returned Goods Authorization RGA Form Warranty Procedure Repair Depot Address Labels ...
Страница 28: ...14 Chapter 1 Getting Started ...
Страница 38: ...24 Chapter 2 Configuring the System 10 In the TCP IP Configuration dialog select OK 11 Restart the system ...
Страница 44: ...30 Chapter 3 Opening and Closing the Base Unit ...
Страница 68: ...54 Chapter 4 Maintaining the System ...
Страница 84: ...70 Chapter 5 Upgrading the System ...
Страница 110: ...96 Chapter 8 Troubleshooting ...
Страница 132: ...118 Appendix B Hardware Information ...
Страница 136: ......