
Installation
5
4
Cam the carrier home - Press on the handle, the camming lever on the right of the carrier will engage into a slot in
the chassis, (
Figure 1–7
) continue to push firmly until the handle fully engages with the carrier cap. A click should
be heard as the latch engages and holds the handle closed.
Figure 1–4
Installing an FC-AL Drive Carrier Module (1)
Figure 1–5
Installing an FC-AL Drive Carrier Module (2)
Figure 1–6
Installing an FC-AL Drive Carrier Module (3)
Содержание Fibre Channel
Страница 3: ...SS 1200 FCAL Rack Installation and User Guide Part No 19933 01 Issue 1 0 June 01 1998 ...
Страница 22: ...SS 1200 FCAL User Guide 12 ...
Страница 34: ...SS 1200 FCAL User Guide 24 ...
Страница 48: ...SS 1200 FCAL User Guide 38 ...
Страница 53: ...SS 1200 FCAL LRC Input Output Module Installation Guide Part No 19934 01 Issue 1 0 June 01 1998 ...
Страница 56: ...iv FCAL LRC I O Module ...
Страница 66: ...FCAL LRC I O Module 8 ...
Страница 69: ...SS 1200 FCAL Drive Carrier Module Installation Guide Part No 19935 01 Issue 1 0 June 01 1998 ...
Страница 72: ...iv FC AL Drive Module ...
Страница 82: ...FCAL Drive Module 8 ...