5.
Quick
Start
-
Initial
Setup
Follow
these
instructions
to
set-up
your
ToughPower
unit
correctly.
1. Ensure
the
Master
Switch
is
in
the
OFF
position
2. Open
the
lid
3. Using
the
Key
inserted
in
the
Concealed
Key-Switch
select
the
12V
Battery
Type
that
you
intend
to
fit
in
the
box
a. TP-600
selection:
Lead
Acid/GEL,
Calcium
and
AGM
b. TP-1000
&
TP-1000
DUAL
selection:
Lead
Acid/GEL,
Calcium,
AGM
&
Lithium
(LiFePO4)
Note:
For
Lead
Crystal
batteries
select
AGM
(same
charging
profile)
4. Remove
the
Key
and
store
in
a
secure
location
5. Place
your
battery
inside
the
box,
secure
it
using
the
Battery
Strap
6. Connect
and
secure
cables
to
battery
terminals
Warning:
Check
the
Polarity
of
your
connections!
Reds
to
Red
(Positive
to
Positive)
Blacks
to
Black
(Negative
to
Negative)
Ensure
each
cable
connection
to
the
battery
terminal
is
secure
and
tight
7. Close
the
lid
and
attach
the
two
latches
8. Turn
the
Master
Switch
to
the
ON
position
9. The
LCD
will
prompt
you
to
update
the
battery
settings:
a. Touch
the
arrows
to
select
the
correct
values
for
your
Battery
Condition
and
Capacity
b. When
finished
touch
SAVE
and
then
HOME
10. Although the unit is now ready to be used, it is
highly recommended to allow the ToughPower to
complete a full charge so the internal battery monitor gets synchronised with the battery state of
charge. If you don’t do this you will only ever see the Voltage displayed on the LCD, and no % or
time
predictions
will
be
displayed.
The
easiest
way
to
achieve
this
is
with
the
Mains
Charger
(though
you
can
use
Solar
or
Car
charging)
a. Plug
the
desired
input
charge
source
(Mains
-
Kettle
cord)
b. Wait
until
charging
is
FULL
or
Battery
percentage
shows
100%
Note:
This
is
a
Quick
Start
guide
intended
for
the
skilled
user
only.
For
more
detailed
instructions
and
explanations
refer
to
the
relevant
section
in
the
User
Manual.
Page
7