background image

ii

Warning

Read all caution and safety 

statements in this document 

before performing any of the 

instructions.  Also see the 

Intel

®

 

Server Board and Server Chassis 

Safety Information

 document at:

http://www.intel.com/support/

motherboards/server/sb/cs-010770

.htm

 

for complete safety information.

           Installation and service

           of this product to be

           performed only by

qualified service personnel

to avoid risk of injury from

electrical shock or energy

hazard.

Warning

Caution

Observe normal ESD

            [Electrostatic Discharge]

            procedures during system

integration to avoid possible

damage to server board and/or

other components.

Tools Required

        Anti-static

wrist strap

     Phillips*

screwdriver

Flat Blade

screwdriver

Intel

®

 is a registered trademark of Intel Corporation or its subsidiaries in the United States and other countries.  *Other names and brands may be claimed as 

the property of others.  Copyright © 2013, Intel Corporation. All rights reserved.

Thermal Operation and Configuration Requirements

To keep the system operating within supported maximum thermal limits, the system must meet the following operating and configuration 
guidelines:

• Ambient in-let temperature cannot exceed 35º C and should not remain at this maximum level for long periods of time.  Doing so

may affect long term reliability of the system.

DIMM Population on CPU: 

Install DIMMs in order; Channels A, and B. Start with 1st DIMM slot (blue) on each

channel.

All hard drive bays must be populated. Hard drive carriers either can be populated with a hard drive or supplied drive blank.

In single power supply configurations, the second power supply bay must have the supplied filler blank installed at all times.

• The system top-cover must be installed at all times.

Содержание P4000RP

Страница 1: ...f you are not familiar with ESD Electrostatic Discharge procedures used during system integration see the complete ESD procedures described in your Service Guide This guide and other supporting docume...

Страница 2: ...This page is intentionally left blank...

Страница 3: ...e 6 Install Hard Drive 6 Install PCI e Card Assembly 7 Install Intel Remote Management Module 4 NIC optional 7 Install RMM4 EMI Cover optional 8 Install Alternate Serial Port optional 8 Install Intel...

Страница 4: ...s subsidiaries in the United States and other countries Other names and brands may be claimed as the property of others Copyright 2013 Intel Corporation All rights reserved Thermal Operation and Con g...

Страница 5: ...pply Two I O Ports A Kensington Cable Lock Mounting Hole PCI Add in Board Slot Covers AC Input Power Connector Two Alternate Serial Port Knockout RMM4 Knockout Padlock Loop Alternate RMM4 Knockout Act...

Страница 6: ...2 System Overview 0 1 2 3 4 5 6 7 Hot Swap Hard Drive Bay Options and HDD Numbering 8 x 3 5 Hot Swap Drive Cage A A...

Страница 7: ...s or install components B A A Remove the Side Cover B Remove the screws A NOTE A non skid surface or a stop behind the chassis may be needed to prevent the chassis from sliding on your work surface Sl...

Страница 8: ...e tip of the lever under the notch in the load plate Make sure the lever is securely latched CAUTION DO NOT damage the server board with the tip of the locking lever Save the protective cover A A A B...

Страница 9: ...e and both levers close IMPORTANT Visually check that each latch is fully closed and correctly engaged with each DIMM edge slot CAUTION Avoid touching contacts when handling or installing DIMMs Instal...

Страница 10: ...plastic drive blank provided to maintain proper system cooling With the lever open insert the hard disk drive assembly into the cage opening and push until the locking lever engaged Push in the lever...

Страница 11: ...agement Module 4 NIC optional Top View A A Attach the metal fastening bracket to Intel Dedicated Server Management NIC module and secure the bracket with two screws B Remove the alternate RMM4 knock o...

Страница 12: ...is C secure the port with two screws D Connect the cable to the Serial B Connector on your server board CAUTION Carefully remove the knock out with screwdriver directly removing it with finger has pot...

Страница 13: ...pull out of the system by the handle NOTE Applies only to the chassis with hot swap power supply configuration A B A B CAUTION This chassis must be operated with the SIDE COVERS installed to ensure p...

Страница 14: ...nd Management DVD for update instructions B Con gure your RAID Controller Use the instructions provided with the RAID controller C Install your Operating System Use the instructions provided with the...

Страница 15: ...nector on backplane A Connect Mini SAS data cables B Connect two power cables C 8 x 3 5 HDD Cage NOTE Refer to the documents which come with your server board and or RAID controller card for instructi...

Страница 16: ...wer Front Panel SYS_FAN_1 SYS_FAN_4 Intel Integrated RAID Module SATA USB B D C E F A G J SAS SPGIO HSBP_I 2 C I PS AUX H K A CPU Power Cable B Server Board Main Power Cable C Backplane Power Cable D...

Страница 17: ......

Страница 18: ...G85600 002...

Отзывы: