Chapter: Lifting and handling
64
M10-17541-EN
Figure 18. Righting a Load Frame Using a Crane
Legend for
4. Slowly lift the frame until the weight of the frame is fully supported by the slings.
5. Remove all bolts and brackets that attach the frame to the shipping skid.
6. Locate any frame feet that may have been removed in order to bolt the frame to the
skid and reinstall them in the locations shown in
.
1
2
Label
Description
1
Two slings around the crosshead.
2
Two slings attached to two M16 hoist rings screwed into frame base beam.
Содержание 34FM-100
Страница 1: ...Model 34FM 100 Dual Column Floor Model Preinstallation Manual M10 17541 EN Revision A...
Страница 8: ...Preliminary Pages 8 M10 17541 EN...
Страница 12: ...Preliminary Pages 12 M10 17541 EN...
Страница 50: ...Chapter Specifications 50 M10 17541 EN...
Страница 58: ...Chapter Risk reduction and safe use 58 M10 17541 EN...
Страница 72: ...Chapter Lifting and handling 72 M10 17541 EN...
Страница 74: ...74 M10 17541 EN...
Страница 75: ......
Страница 76: ...www instron com...