For the latest fitting instructions please visit
www.insigniarange.co.uk
For the latest fitting instructions please visit
www.insigniarange.co.uk
VERY IMPORTANT
Have you got everything? If not please contact your supplying
dealer
now
. Remember
NEVER
book your tradesman until every-
thing has arrived, been checked and is present. No replacement /
missing parts can obtained free of charge during or after build only
within the timescale permitted (48 hours after delivery) and always
BEFORE
build.
GOT EVERYTHING AS YOU SHOULD?
GREAT NOW FOR BUILD PLEASE READ ON!
TO START.
Make sure you have a clear space, remember when finished and in
place you need access to check your build and able to pull the
shower out should you need to replace anything!
Taking the tub remove all protective films and the columns packed
at the rear of the bath. You now need to level it in order the water
runs correctly down the waste. Place the bath section on the posi-
tion you require it when fully built. Now using a sprit level carefully
adjust the feet underneath. When you are happy with the result
and all feet firmly connect to the floor move the bath out to a
more assessable working space.
Now secure the bath waste and seal into position to align and
point the same way as your house waste as would be normally un-
dertaken with a standard bath. Check now the pipe attached to
the spigot coming from the waste is tight and the clip firm. This
pipe goes to the steam generator waste.
15 16
Adjust bath Feet
Normal waste set up using optional fitting kit
Shower tray shown as example of the bath tub levelling required.