background image

Содержание AIO 10.5kW

Страница 1: ...Ge n e r a t o r S h o u l dy o ur e q u i r ea d d i t i o n a l a s s i s t a n c ewi t ht h e i n s t a l l a t i o no f y o u r p r o d u c t p l e a s ec a l l 0 1 9 0 83 1 7 5 1 2 o r e ma i l...

Страница 2: ...AN BE MADE ONCE THE BUILD HAS STARTED AS IT IS DEEMED ACCEPTANCE OF PRODUCT 30 Day Technical Support Call 01908 317512 and request technical support for aiding your installation Replacements Parts Ins...

Страница 3: ...ation 12 Installation of the Generator 16 Lights Installation 18 Aroma Pump Installation 19 Descaling Pump System Installation 22 Exhaust Fan Installation 23 Salt Spray Generator Installation 25 Water...

Страница 4: ...ad this booklet with great care to ensure you get the best out of your install and have a steam unit that will last for many years to come Like everything in order to obtain a first class product that...

Страница 5: ...gative effect on the flow of steam and condensate The steam pipelines should be installed with a slight angle so that the condensate can flow back to the generator or the steam head 6 Steam generator...

Страница 6: ...1 The rated power is measured under single phase 230V therefore the actual operating power under single phase 215 240V 50 60Hz or three phases 380 415V 50 60Hz may be different from the rated value 2...

Страница 7: ...le 3 Small cover 4 Sub board relay board 5 Wire terminal 6 U shape cover 7 Water inlet position 8 Steam outlet 9 Water level sensor 10 Inner tank 11 Back Cover 12 Water inlet hose 13 Solenoid water in...

Страница 8: ...am Generator Construction 1 Steam outlet 2 Safety valve 3 Heating elements 4 Solenoid water inlet valve 5 Drain valve 6 Drain pipe 7 High temperature protection 8 Wire terminal 9 Sub board relay 10 Wa...

Страница 9: ...equired Never starve the unit of air as it could cause the unit to enter into heat protection mode and could damage the unit The generator can be installed either on the wall or on the ground but must...

Страница 10: ...ture sensor 3 Controller 4 Steam room humidity sensor 5 Fast steam switch 6 Fan 7 Coloured lights 8 Salt spray generator 9 Aroma pump 10 Descaling pump 11 Connector to the steam generator 12 Power sup...

Страница 11: ...ent for your setup Create a recess as shown install the housing box tile to the edge of the housing box ensure cabling is pulled through connect the control panel and then place the control panel into...

Страница 12: ...NOT be installed on the side of the wall which is behind the door 4 The temperature sensor is used to measure the temperature inside the steam room so that the generator can work automatically accord...

Страница 13: ...Last Modified 06 05 2022 12 7 5 kW Generator 1 Service hole 1 2 2 Steam Outlet 3 4 3 Safety Valve 1 2 4 Water Inlet 1 2 5 Drain Outlet 3 4 6 Power Supply for Drain Valve 1 2 3 4 5 6 Installation of P...

Страница 14: ...Modified 06 05 2022 13 10 5kW 12kW Generator 1 Service hole 1 2 2 Steam Outlet 3 4 3 Safety Valve 1 2 4 Water Inlet 1 2 5 Drain Outlet 3 4 6 Power Supply for Drain Valve 1 2 3 4 5 6 Installation of Pi...

Страница 15: ...2 5 Drain Outlet 3 4 6 Power Supply for Drain Valve 1 2 3 4 5 6 terminal blocks heating element 1 heating element 2 heating element 3 heating element 4 heating element 6 heating element 5 L1 L2 L3 N L...

Страница 16: ...2 3 4 5 6 terminal blocks cathode NO COM COM NO 5 4 6 1 3 NO COM NO COM COM NO 5 4 6 1 3 NO COM NO COM COM NO 5 4 6 1 3 NO COM 4506 Over heat protection Over heat protection L1 L2 L3 N L3 L2 L1 heati...

Страница 17: ...terial pipe will NOT be suitable Steam outlet Use copper or stainless steel pipe to connect the steam head and the steam outlet pipe of the generator The pipe should be as short as possible with minim...

Страница 18: ...am Head The steam head should be about 300mm from the ground and at least 150mm from the installed seating Please apply silicone glue on the steam pipe nipple and back of the steam head then screw the...

Страница 19: ...W PC Open a hole 52mm on the ceiling put the light into the hole screw the rubber ring from the backside 1 Connect the Power Adaptor to the Synchroniser 2 Connect the Coloured Lights to each other in...

Страница 20: ...ve the steam room immediately and seek medical advice if necessary Keep the aroma pump and essential oil away from children If any contact is made with eyes or mouth rinse immediately with plenty of w...

Страница 21: ...www insigniashowers com Last Modified 06 05 2022 20...

Страница 22: ...le to children It is strongly recommended to install the system in a separate room The aroma pump system output MUST be higher than the Injection pipe but the height difference should not exceed 1 5m...

Страница 23: ...place where the liquid can become frozen 7 Never install where flammable corrosive or chemicals are in close proximity Location The descaling pump cannot be installed directly above or below the stea...

Страница 24: ...cal norms Make sure there are no loose elements near the ventilator as they could run the risk of being sucked up by it If it is going to be installed in a duct check that it is clean of any element t...

Страница 25: ...ive solution for installations where space is restricted Unscrew and open the wiring box Connect the neutral wire and live wire EU type 220 V single phase Connect N and LA DO NOT connect anything to L...

Страница 26: ...on and deactivation with no time able to be set J For an independent installation of the salt spray generator skip steps 1 2 right K The salt spray generator MUST be installed vertically never install...

Страница 27: ...gly advise against disassembling the unit yourself The salt spray generator should be out the reach of children to avoid any accident Filling the bottles with salt water Remove the glass bottles from...

Страница 28: ...Remove both end caps from the cartridge being careful not to lose the rubber washer located in the water outlet cap No washer is supplied with the water inlet Note the directional flow on the back of...

Страница 29: ...le water temperature 2 C 120 C Maintenance Not Required Lifespan 8 10 years Main benefit Reduce Scale inhibition Earth bonding continuity not required IMPORTANT The water utilities cannot be held resp...

Страница 30: ...rgency button which is located inside the steam room then the system will send out the buzzing sound to alert the staff whilst stopping the steam generator at the same time Pressing the Emergency butt...

Страница 31: ...am switch the steam will come out in approx 30 seconds and runs for 30 minutes After this time the system will the revert back to stand by Heat preservation state Create the housing hole for the back...

Страница 32: ...s well as also saving energy The 30 minutes automatic back to stand by status design would prevent energy waste caused by the owner or customers forgetting to turn off the steam generator after use Th...

Страница 33: ...the steam generator automatically The system should be installed on the external wall of the steam room 1 Power Adapter for the door control system 2 Glass Door 3 Sensor 3A fixed part with cable insta...

Страница 34: ...www insigniashowers com Last Modified 06 05 2022 33 Installation Diagram...

Страница 35: ...0V for single phase or 380 415V for three phase 50 60Hz The selection of fuse and breaker must strictly follow the data in the table on page 5 Choose the suitable power wire according to the table on...

Страница 36: ...S19 Water tank temperature S4 Heating instructions S12 Celsius degree S5 Domestic model S13 Heat preservation instructions S20 Drain valve S6 Commercial model Control Panel Interface COLOURED LIGH TS...

Страница 37: ...con is shown on the screen Press the up arrow to choose the setting change colours automatically The panel screen will revert back to the home screen and the lights will change colour automatically To...

Страница 38: ...ace until the time icon is shown Use the up and down arrows to change the time setting The default set time will countdown on the display until it completes and it shuts off The control panel will rem...

Страница 39: ...mber of working heating elements for the best efficiency Auto water supplementing If the water level is lower than the desired level when operating auto water supplementing function will be on and ope...

Страница 40: ...ard Switch off the steam generator and remove the U shape cover when the generator completely cools down Unplug all the wires on the sub board Label all the wires on the relay and remove the sub board...

Страница 41: ...the code should disappear after the room temperature drops below 60 C Otherwise check the connection of the sensor E Water supply or water fill faults the heating elements will not heat up or stop hea...

Страница 42: ...ut does not heat up check the connection wire between main circuit board and the sub board the relays on sub board and heating elements If water comes out from the steam outlet pipe clean or change th...

Страница 43: ...hrough service hole and let it sit in water tank for 4 8 hours then flush How frequently should descaling be done For home use at least once per month For commercial use at least once per week Product...

Страница 44: ...sult your GP before use 6 If you have any underlying health conditions which you feel could be aggravated by using a steam room consult your GP before use 7 If you begin to have any issues with your h...

Страница 45: ...ommon crossed out wheelie bin label We accept returns of all products carrying the Insignia brand All other products are either considered outside the scope of WEEE or Insignia is not technically the...

Страница 46: ...www insigniashowers com Last Modified 06 05 2022 45...

Отзывы: