
8
APPENDIX
26
IPAQ C520/R520
www.inor.com
02/2019 - 86B520S001 - AD 520 SIL R1.4 en
8.4 Return / maintenance form
Customer details
Device details
If yes please fill out the table with following check points.
Before you begin, configure the C520/R520 for RTD measurement 3-wire connection on both
channels. Select measuring range 0...+100
°
C, output
–
dedicated dynamic variable Ch1 select
sensor break and sensor short circuit to downscale, thereafter to upscale value.
Also check the Sensor backup function by selecting Sensor backup. This is done in step 4.
Proof test check points
Send goods including this document to
Company:
Address:
Contact person:
Telephone:
Fax:
Email:
Product ID:
Serial no.:
Reason for the return / maintenance:
Have you performed the proof test on the product?
Yes
No
Step
Description
Yes
No
Comments
1
Connect the selected sensors on Ch 1 and Ch2 and
check for the output range value is within measuring
range.
2
Simulate sensor break for each single wire (on
terminals 1...5) and check the output value (
≥
21 mA) /
(
≤
3.6 mA).
3
Simulate sensor short between 1...5 terminals and
check the output value (
≥
21 mA) / (
≤
3.6 mA).
4
Simulate sensor break or sensor short (one error at a
time) for sensor connected on Ch 1. Check if the
transmitter will switch automatically over to
measuring on Ch 2.
Содержание IPAQ C520
Страница 22: ...8 APPENDIX 22 IPAQ C520 R520 www inor com 02 2019 86B520S001 AD 520 SIL R1 4 en...
Страница 23: ...APPENDIX 8 23 IPAQ C520 R520 www inor com 02 2019 86B520S001 AD 520 SIL R1 4 en...
Страница 25: ...APPENDIX 8 25 IPAQ C520 R520 www inor com 02 2019 86B520S001 AD 520 SIL R1 4 en...
Страница 27: ...NOTES 9 27 IPAQ C520 R520 www inor com 02 2019 86B520S001 AD 520 SIL R1 4 en...