Available energy source
Emergency charge
Description
External photovoltaic inverter
INGECON SUN 1Play
Manual
Manually activate the emergency charge to charge the
batteries from the external photovoltaic inverter.
Open Main menu > More options > Emergency charge.
It is recommended to disconnect all the consumers
from the installation so that all the photovoltaic energy is
used for charging the batteries.
Once the batteries reach the configured SOCrecx state
of charge the consumers can be connected again.
18.21. Performing a ventilation test
Occasionally it is necessary to test the proper performance of the unit's external and internal fans. These units have
the option of performing a ventilation test.
To perform the ventilation test open
MAIN MENU
>
CONFIGURATION
>
TEST FANS
. Press OK to start the
test. The unit's fans will start to turn for approximately 15 seconds. After this time, the test will automatically
deactivate. If one or several of the fans do not turn, a ventilation fault is displayed:
•
Code1 0x0008 “fault in internal fan”
•
Code1 0x0010 “fault in external fan”
If all ventilators turn, the test's result is positive.
INFO
The ventilation test only checks the turning of the fans. A positive ventilation test alone does not indicate that
the system's ventilation status is correct. To assure proper performance of the ventilation system, also check
that there are no elements obstructing air passage and that the fans are properly installed.
18.22. Performing an equalization charge of the batteries
For certain lead-acid battery models the manufacturer recommends performing a periodic equalization charge.
During the equalization charge the inverter equalizes the state of charge of the cells and compensates the
electrolyte stratification. This prevents a premature failure of the individual cells and extends the service life of the
battery. This process produces gasification, so a proper ventilation of the batteries is necessary.
Before performing a manual equalization charge, consult the battery manufacturer for the charge voltage and
duration.
CAUTION
An incorrect configuration of these settings can reduce the battery life. Ingeteam accepts no liability for the
consequences that may arise from incorrect configuration of the unit by the user and/or the installer.
To configure the parameters in the unit, open
MAIN MENU
>
CONFIGURATION
>
BATTERY
>
LEAD-ACID
>
SETTINGS
.
Setting
Description
V EQUALIZATION
Equalization charge voltage of the battery bank, specified by the battery manufacturer (V).
T EQUALIZATION
Duration of the equalization charge of the battery bank, specified by the battery
manufacturer (minutes).
The equalization charge must be manually activated via the display. To do this, open
MAIN MENU
>
MORE
OPTIONS
>
MANUAL EQUALIZATION
.
18.23. Grounding fault detection and alarm
These inverters comply with clause 13.9 of the
IEC 62109-2
standard for monitoring grounding fault alarms.
64
Display control
Ingeteam
Содержание INGECON SUN STORAGE 1Play
Страница 1: ...INGECON SUN STORAGE 1Play Installation and Operation Manual ...
Страница 70: ...Notes ...
Страница 72: ...ABH2015IQE01_ 12 2021 Ingeteam Power Technology S A www ingeteam com ...