ABH2015IQE01_ - Installation and Operation Manual
15. Connecting the digital inputs
The management of the digital inputs varies depending on the inverter hardware type.
This chapter explains the requirements and process for connecting the digital input wiring to the unit. Read
carefully before starting the connection process.
15.1. Safety instructions for connecting the digital input
CAUTION
Before you start to make the connections, make sure there is no voltage in the inverter. Verify that the AC
protection of the auxiliary genset and the DC protection of the storage system are open, as well as the PV array
and the consumption grid.
Do not switch on the power
to the unit until you have successfully made the rest of the connections and the unit
is closed.
When carrying out the connections, respect the polarities marked on the electronic card.
15.2. Wiring requirements for connecting the digital input
The wiring gauge for connecting the digital inputs is specified in the following table:
INGECON SUN STORAGE 1Play
Wiring gauge
0.25 mm
2
~ 1.5 mm
2
Cable diameter
4.5 ~ 10 mm
Wiring stripping length (L*)
8 mm
L*
15.3. Specifications for the digital inputs depending on the inverter
hardware
The distribution of the digital inputs varies depending on the inverter hardware type (A or B).
Hardware type A
42
Connecting the digital inputs
Ingeteam
Содержание INGECON SUN STORAGE 1Play
Страница 1: ...INGECON SUN STORAGE 1Play Installation and Operation Manual ...
Страница 70: ...Notes ...
Страница 72: ...ABH2015IQE01_ 12 2021 Ingeteam Power Technology S A www ingeteam com ...