ABH2015IQE01_ - Installation and Operation Manual
Hardware type B: TT system
1. Loosen the cable gland marked
GENSET
, remove the protective cap and pass the cable through it.
2. Install the ferrite core supplied by Ingeteam, turning the line and neutral wires around it twice.
3. Insert the respective wires in the
J55 GENSET
push-in type terminals, respecting the polarity. The neutral
connector must be connected to the
J55 N
TT
terminal. The operation of this type of terminal is described
“7. Connection/disconnection of wiring in push-in type terminals”
4. Correctly tighten the packing glands to prevent losses to the protection class, verifying that the wiring is
not taut.
Hardware type B: TN system
1. Loosen the cable gland marked
GENSET
, remove the protective cap and pass the cable through it.
2. Install the ferrite core supplied by Ingeteam, turning the line and neutral wires around it twice.
3. Insert the respective wires in the
J55 GENSET
push-in type terminals, respecting the polarity. The neutral
connector must be connected to the
J55 N
TN
terminal.
4. Check that the push-in spring connection is tight.
5. Correctly tighten the packing glands to prevent losses to the protection class, verifying that the wiring is
not taut. Check that the connection is tight.
33
Auxiliary genset connection
Ingeteam
Содержание INGECON SUN STORAGE 1Play
Страница 1: ...INGECON SUN STORAGE 1Play Installation and Operation Manual ...
Страница 70: ...Notes ...
Страница 72: ...ABH2015IQE01_ 12 2021 Ingeteam Power Technology S A www ingeteam com ...