background image

6

18-CE01D1-1F-EN

C

CA

AU

UT

TIIO

ON

N

D

DO

O N

NO

OT

T U

US

SE

E A

AS

S C

CO

ON

NS

ST

TR

RU

UC

CT

TIIO

ON

N

H

HE

EA

AT

TE

ER

R!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss C

Ca

au

uttiio

on

n cco

ou

ulld

d rre

essu

ulltt iin

n

p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e o

orr p

pe

errsso

on

na

all iin

njju

urry

y..

G

Ga

ass ffu

urrn

na

acce

ess m

ma

an

nu

uffa

accttu

urre

ed

d o

on

n o

orr a

afftte

err M

Ma

ay

y 1

1,,

2

20

01

17

7 a

arre

e n

no

ott p

pe

errm

miitttte

ed

d tto

o b

be

e u

usse

ed

d iin

n C

Ca

an

na

ad

da

a ffo

orr

h

he

ea

attiin

ng

g b

bu

uiilld

diin

ng

gss o

orr ssttrru

uccttu

urre

ess u

un

nd

de

err

cco

on

nssttrru

uccttiio

on

n.. F

Fo

orr n

no

on

n--C

Ca

an

na

ad

diia

an

n a

ap

pp

plliicca

attiio

on

nss,, iin

n

o

orrd

de

err tto

o p

prre

ev

ve

en

ntt ssh

ho

orrtte

en

niin

ng

g iittss sse

errv

viicce

e lliiffe

e,, tth

he

e

F

Fu

urrn

na

acce

e ssh

ho

ou

ulld

d N

NO

OT

T b

be

e u

usse

ed

d a

ass a

a “

“C

Co

on

nssttrru

uccttiio

on

n

H

He

ea

atte

err”

” d

du

urriin

ng

g tth

he

e ffiin

niissh

hiin

ng

g p

ph

ha

asse

ess o

off

cco

on

nssttrru

uccttiio

on

n u

un

nttiill tth

he

e rre

eq

qu

uiirre

em

me

en

nttss lliisstte

ed

d iin

n tth

he

e

ssa

affe

etty

y sse

eccttiio

on

n o

off tth

he

e IIn

nsstta

alllle

err''ss G

Gu

uiid

de

e h

ha

av

ve

e b

be

ee

en

n

m

me

ett.. C

Co

on

nd

de

en

nssa

atte

e iin

n tth

he

e p

prre

esse

en

ncce

e o

off cch

hllo

orriid

de

ess a

an

nd

d

ffllu

uo

orriid

de

ess ffrro

om

m p

pa

aiin

ntt,, v

va

arrn

niissh

h,, sstta

aiin

nss,, a

ad

dh

he

essiiv

ve

ess,,

cclle

ea

an

niin

ng

g cco

om

mp

po

ou

un

nd

dss,, a

an

nd

d cce

em

me

en

ntt ccrre

ea

atte

e a

a

cco

orrrro

ossiiv

ve

e cco

on

nd

diittiio

on

n w

wh

hiicch

h m

ma

ay

y cca

au

usse

e rra

ap

piid

d

d

de

ette

erriio

orra

attiio

on

n o

off tth

he

e h

he

ea

att e

ex

xcch

ha

an

ng

ge

err..

C

CA

AU

UT

TIIO

ON

N

IIG

GN

NIIT

TIIO

ON

N F

FU

UN

NC

CT

TIIO

ON

N!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss cca

au

uttiio

on

n m

ma

ay

y rre

essu

ulltt iin

n p

po

oo

orr

iig

gn

niittiio

on

n cch

ha

arra

acctte

erriissttiiccss..

M

Ma

aiin

ntta

aiin

n m

ma

an

niiffo

olld

d p

prre

essssu

urre

e iin

n h

hiig

gh

h a

allttiittu

ud

de

e

iin

nsstta

alllla

attiio

on

nss..

C

CA

AU

UT

TIIO

ON

N

W

WA

AT

TE

ER

R D

DA

AM

MA

AG

GE

E!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss C

Ca

au

uttiio

on

n cco

ou

ulld

d rre

essu

ulltt iin

n

p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e o

orr p

pe

errsso

on

na

all iin

njju

urry

y..

IItt iiss rre

ecco

om

mm

me

en

nd

de

ed

d tth

ha

att a

an

n e

ex

xtte

errn

na

all o

ov

ve

errffllo

ow

w d

drra

aiin

n

p

pa

an

n b

be

e iin

nsstta

alllle

ed

d iin

n a

allll a

ap

pp

plliicca

attiio

on

nss o

ov

ve

err a

a ffiin

niissh

he

ed

d

cce

eiilliin

ng

g tto

o p

prre

ev

ve

en

ntt p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e o

orr p

pe

errsso

on

na

all

iin

njju

urry

y ffrro

om

m lle

ea

akkiin

ng

g cco

on

nd

de

en

nssa

atte

e..

C

CA

AU

UT

TIIO

ON

N

H

HO

OT

T S

SU

UR

RF

FA

AC

CE

E!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss C

Ca

au

uttiio

on

n cco

ou

ulld

d rre

essu

ulltt iin

n

p

pe

errsso

on

na

all iin

njju

urry

y..

D

Do

o N

NO

OT

T tto

ou

ucch

h iig

gn

niitte

err.. IItt iiss e

ex

xttrre

em

me

elly

y h

ho

ott..

C

CA

AU

UT

TIIO

ON

N

F

FU

UR

RN

NA

AC

CE

E S

SE

ER

RV

VIIC

CE

E C

CA

AU

UT

TIIO

ON

N!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss w

wa

arrn

niin

ng

g cco

ou

ulld

d rre

essu

ulltt iin

n

p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e o

orr p

pe

errsso

on

na

all iin

njju

urry

y..

L

La

ab

be

ell a

allll w

wiirre

ess p

prriio

orr tto

o d

diisscco

on

nn

ne

eccttiio

on

n w

wh

he

en

n

sse

errv

viicciin

ng

g cco

on

nttrro

ollss.. V

Ve

erriiffy

y p

prro

op

pe

err o

op

pe

erra

attiio

on

n a

afftte

err

sse

errv

viicciin

ng

g.. W

Wiirriin

ng

g e

errrro

orrss cca

an

n cca

au

usse

e iim

mp

prro

op

pe

err a

an

nd

d

d

da

an

ng

ge

erro

ou

uss o

op

pe

erra

attiio

on

n..

C

CA

AU

UT

TIIO

ON

N

W

WIIR

RIIN

NG

G IIN

NF

FO

OR

RM

MA

AT

TIIO

ON

N!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

hiiss C

Ca

au

uttiio

on

n cco

ou

ulld

d rre

essu

ulltt iin

n

p

prro

op

pe

errtty

y d

da

am

ma

ag

ge

e o

orr p

pe

errsso

on

na

all iin

njju

urry

y..

T

Th

he

e iin

ntte

eg

grra

atte

ed

d ffu

urrn

na

acce

e cco

on

nttrro

oll iiss p

po

olla

arriitty

y

sse

en

nssiittiiv

ve

e.. T

Th

he

e h

ho

ott lle

eg

g o

off tth

he

e 1

12

20

0 V

VA

AC

C p

po

ow

we

err m

mu

usstt

b

be

e cco

on

nn

ne

ecctte

ed

d tto

o tth

he

e B

BL

LA

AC

CK

K ffiie

elld

d lle

ea

ad

d..

S

SA

AF

FE

ET

TY

Y S

SE

EC

CT

TIIO

ON

N—

— F

FU

UR

RN

NA

AC

CE

ES

S

Содержание S9V2B040D3PSBA

Страница 1: ...ruary 2017 1 18 8 C CE E0 01 1D D1 1 1 1F F E EN N D345855P01 Upflow Horizontal and Downflow Gas Fired Direct Non Direct Vent 2 Stage Condensing Variable Speed Furnaces U Up pf fl lo ow w C Co on nv v...

Страница 2: ...s w wa ar rn ni in ng g c co ou ul ld d r re es su ul lt t i in n p pr ro op pe er rt ty y d da am ma ag ge e p pe er rs so on na al l i in nj ju ur ry y o or r d de ea at th h N Ne ev ve er r u us s...

Страница 3: ...he e d do oo or r s sw wi it tc ch h o or r p pa an ne el l l lo oo op p b by y a an ny y p pe er rm ma an ne en nt t m me ea an ns s W WA AR RN NI IN NG G E EL LE EC CT TR RI IC CA AL L S SH HO OC CK...

Страница 4: ...e i in n h ho or ri iz zo on nt ta al l a ap pp pl li ic ca at ti io on ns s I In ns st ta al ll l t th he e f fi il lt te er r r re em mo ot te el ly y W WA AR RN NI IN NG G S SA AF FE ET TY Y H HA...

Страница 5: ...h he er r m mo on nt th hs s p pr ro ov vi is si io on ns s m mu us st t b be e t ta ak ke en n t to o p pr re ev ve en nt t f fr re ee ez ze e u up p o of f a al ll l w wa at te er r p pi ip pe es s...

Страница 6: ...it tu ud de e i in ns st ta al ll la at ti io on ns s C CA AU UT TI IO ON N W WA AT TE ER R D DA AM MA AG GE E F Fa ai il lu ur re e t to o f fo ol ll lo ow w t th hi is s C Ca au ut ti io on n c co...

Страница 7: ...in ne ed d t th ha at t e ea ac ch h a ap pp pl li ia an nc ce e c co on nn ne ec ct te ed d t to o t th he e v ve en nt ti in ng g s sy ys st te em m p pr ro op pe er rl ly y v ve en nt ts s w wh he...

Страница 8: ...in Instructions 60 60 Vertical Applications 61 Horizontal Applications 64 General Start up and Adjustment 65 Preliminary Inspections 65 Lighting Instructions 65 Control and Safety Switch Adjustment 65...

Страница 9: ...tion starting up and servicing of heating ventilating and air conditioning equipment can be hazardous and requires specific knowledge and training Improperly installed adjusted or altered equipment by...

Страница 10: ...ters must be in place f 100 of the Furnace combustion air requirement must come from outside the structure g The Furnace return air temperature range is between 55 and 80 Fahrenheit h Clean the Furnac...

Страница 11: ...hes front accessibility to the Furnace must be provided Any access door or panel must permit removal of the largest component 4 Are there at least 3 inches of clearance between the Furnace combustion...

Страница 12: ...12 18 CE01D1 1F EN Outline Drawings...

Страница 13: ...18 CE01D1 1F EN 13 O Ou ut tl li in ne e D Dr ra aw wi in ng gs s...

Страница 14: ...14 18 CE01D1 1F EN O Ou ut tl li in ne e D Dr ra aw wi in ng gs s...

Страница 15: ...18 CE01D1 1F EN 15 O Ou ut tl li in ne e D Dr ra aw wi in ng gs s...

Страница 16: ...16 18 CE01D1 1F EN O Ou ut tl li in ne e D Dr ra aw wi in ng gs s...

Страница 17: ...18 CE01D1 1F EN 17 O Ou ut tl li in ne e D Dr ra aw wi in ng gs s...

Страница 18: ...ace General Installation The following sections give general instructions for the installation of the gas furnaces S Series Furnace Panel Removal Note Use a 5 16 Allen wrench to remove the front panel...

Страница 19: ...the default location The upflow furnace default is left side gas piping The downflow furnace default is right side gas piping Upflow furnace with gas piping on left side Upflow furnace with gas piping...

Страница 20: ...upflow furnace default is left side gas piping The downflow furnace default is right side gas piping Horizontal left furnace with gas piping out left side Horizontal left furnace with gas piping out r...

Страница 21: ...closing its individual manual shut off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1 2 psig 3 5 kPa Note Maximum pressure to the gas valve...

Страница 22: ...utility company and compare to the nameplate rating This must not exceed the nameplate rating Gas Flow in Cubic Feet Per Minute 2 Cubic Foot Dial Sec Flow Sec Flow Sec Flow Sec Flow 8 900 29 248 50 14...

Страница 23: ...ameplate rating unless the unit is derated for high altitude d Replace and tighten the regulator cover screw securely 6 Adjust 2nd stage gas heat by removing the high HI adjustment regulator cover scr...

Страница 24: ...ICES DRILL SIZE PART NUMBER DRILL SIZE PART NUMBER 44 ORF00501 54 ORF00555 45 ORF00644 55 ORF00693 46 ORF00909 56 ORF00907 47 ORF00910 57 ORF00908 48 ORF01099 58 ORF01338 49 ORF00503 59 ORF01339 50 OR...

Страница 25: ...em must not be interchanged with other vent systems or unlisted pipe or fittings Plastic components specified primers and glues must be from a single system manufacturer and not intermixed with other...

Страница 26: ...into the furnace compartment which could lead to premature component failure We recommend following one of the options to prevent this condition from occurring and possibly damaging components within...

Страница 27: ...to prevent condensation from occurring in the furnace cabinet Do not tee AC condensate and combustion air condensate trap together Option 3 Side combustion air intake If sloping the combustion air in...

Страница 28: ...e house The inlet air coming from the interior of the house must meet combustion requirements for area etc as shown in the section AIR FOR COMBUSTION AND VENTILATION in this Installer s Guide Furnace...

Страница 29: ...yp pr ro op py yl le en ne e v ve en nt ti in ng g s sy ys st te em ms s F Fo ol ll lo ow w t th he e m ma an nu uf fa ac ct tu ur re er r s s i in ns st ta al ll la at ti io on n i in ns st tr ru uc...

Страница 30: ...20 158 ASTM D1785 D2241 SDR SERIES 158 ASTM D2241 CPVC ASTM STANDARD PIPE TYPE ALLOWABLE TEMPERATURE F MARKING D2846 CPVC 41 212 ASTM D2846 F441 SCH 40 80 212 ASTM F441 F442 SDR SERIES 212 ASTM F442 A...

Страница 31: ...L TABLE EQUIVALENT VENT LENGTHS MAY BE DIFFERENT FROM WHAT IS SHOWN ABOVE REFER TO THE VENTING SYSTEM MANUFACTURER S INSTALLATION INSTRUCTIONS FOR APPROPRIATE VENTING DIAMETERS AND EQUIVALENT LENGTHS...

Страница 32: ...ing coupling it is used for 3 vent pipe installation Make sure the marking TOP is located on the top side of the pipe in horizontal venting applications The straight side of the coupling must be on bo...

Страница 33: ...t metal Minimum dimensions are 12 x12 Shield must be fastened to both inside and outside of wall Use screws or anchor type fasteners suited to the outside or inside wall surfaces NONCOMBUSTIBLE MATERI...

Страница 34: ...ions for two pipe venting system Both terminations must be located in the same pressure zone Important Maintain 12 minimum clearance above highest anticipated snow level or grade whichever is greater...

Страница 35: ...in 3 feet of the vent terminal The vent for this appliance shall not terminate 1 Over public walkways or 2 Near soffit vents or crawl space vents or other areas where condensate or vapor could create...

Страница 36: ...e met at the time of completion of installation the owner shall have a period of thirty 30 days to comply with the above requirements provided however that during said thirty 30 day period a battery o...

Страница 37: ...lding or the combustion air inlet to any other appliance 6 inches 15 cm for appliances 10 000 Btuh 3 kw 12 inches 30 cm for appliances 10 000 Btuh 3 kw and 100 000 Btuh 30 kw 36 inches 91 cm for appli...

Страница 38: ...building or the combustion air inlet to any other appliance 6 inches 15 cm for appliances 10 000 Btuh 3 kw 12 inches 30 cm for appliances 10 000 Btuh 3 kw and 100 000 Btuh 30 kw 36 inches 91 cm for ap...

Страница 39: ...RIBS FROM CAP COMBUSTION AIR ROOF FLASHING BOOT FIELD SUPPLIED COMBUSTION AIR VENT ELBOW FIELD SUPPLIED MAINTAIN 12 IN 18 IN FOR CANADA MINIMUM CLEARANCE ABOVE HIGHEST ANTICIPATED SNOW LEVEL MAXIMUM O...

Страница 40: ...TABLE SUPPORT METHOD Venting Through an UNUSED Chimney Important Refer to Section 12 6 8 of NFPA 54 ANSI 223 1 2012 when routing vent piping through a chimney Important The single wall flue pipe joint...

Отзывы: