EonStor DS B12/B24 Series
49
88
Installing the RAID Controller
WARNING
When inserting the controller, please make sure you apply pressure evenly on both
sides of the rear controller panel. Uneven pressure may slant the insertion angle and
damage connector pins!
After completing the battery backup unit and flash backup module installation, the
RAID controller can be re-inserted into the enclosure:
1. Insert the controller slowly into the module slot. When you feel the contact
resistance by your hands, use more force, and then push both of the ejection
levers in the direction (indicated by the
blue arrows
)
to secure the controller
into chassis.
1U systems
2U systems
2. Secure the controller by fastening the two screws you previously removed to
the ejection levers.
NOTE
Installation of the CBM on the controller should occur
BEFORE
rack-mounting.
A new or replaced BBU takes at least 12 hours to charge to its full capacity.
Follow the procedures shown in
Replacing the Controller Module
to replace a faulty
BBU with a new one in order to maintain fault-tolerant features.