EonStor DS B12/B24 Series
29
Power Connections
Once all hard drives have been properly installed and the I/O ports or management
interfaces have been connected, the system can be powered on.
113
Checklist
BEFORE
powering on the system, please check the following:
CBM:
Make sure the CBM has been properly installed before
powering-on the system.
Hard drives:
Hard drives have been correctly installed in the drive
trays.
Drive trays:
All the drive trays, whether or not they contain a hard drive,
have been installed into the system.
Cable connections:
The system has been correctly connected to host
computer(s), management computers, or external networking devices.
90