Maintenance works
99
iina
74
e 0
9
.f
m
te
chn
ica
l ha
nd
boo
k
(1
40
8)
9.9
Turbomolecular pump TMH 071
The PFEIFFER turbomolecular pump requires a maintenance annually or every
4000 working hours. Please refer to the PFEIFFER operating instructions PM 800
504 BN/F and PT 0017 BN/B for more detailled informations. The maintenance work
should be performed by the INFICON service or an authorized INFICON service
partner.
9.10
Scroll Pump
Take the maintenance rates of the different scroll pump (IWATA, VARIAN) from the
maintenance plan in chapter
The maintenance of the scroll pump should be exclusively performed by the
INFICON service or an authorized INFICON service partner.
Содержание UL5000
Страница 102: ...102 Declaration of Conformity iina74e SIX fm technical handbook 1408 Declaration of Conformity ...
Страница 103: ...Declaration of Conformity 103 iina74e SIX fm technical handbook 1408 ...
Страница 105: ...Declaration of Conformity 105 iina74e SIX fm technical handbook 1408 ...
Страница 108: ...3 iina74e1RL fm technical handbook 1408 ...