![Indian Motorcycle SCOUT BOBBER 2021 Скачать руководство пользователя страница 108](http://html1.mh-extra.com/html/indian-motorcycle/scout-bobber-2021/scout-bobber-2021_owners-manual_2053802108.webp)
4. Make sure the positive (+) cable is routed horizontally and
perpendicular to the long side of the battery. Connect the
positive (+) cable to the positive (+) battery terminal. Reapply
the rubber protective cover over the top of the positive battery
terminal.
TORQUE
45 in-lbs (5 N
·
m)
5. Install the negative (-) ground cable last.
TORQUE
45 in-lbs (5 N
·
m)
6. Reinstall the battery hold-down strap.
TORQUE
96 in-lbs (10.8 N
·
m)
7. Reinstall the seat. See the Seat Removal / Installation section for
directions.
BBAATTTTEERRYY CCHHAARRGGIINNGG
If your motorcycle will not be used for a period of four (4) weeks
or longer, a maintenance charger should be connected to the
battery. A maintenance charger can be purchased through your
authorized INDIAN MOTORCYCLE dealer or other qualified
dealer.
The Battery Charge Port/Heated Gear plug
q
is located behind the
ignition switch cover.
CAUTION
Wait until engine components have cooled before handling the
gear plug.
106
Содержание SCOUT BOBBER 2021
Страница 3: ...2021 Rider s Manual Indian Scout Bobber Indian Scout Bobber Twenty Indian Scout Bobber Sixty ...
Страница 8: ...6 ...
Страница 22: ...20 ...
Страница 44: ...42 ...
Страница 54: ...52 ...
Страница 126: ...124 ...
Страница 142: ...140 ...
Страница 154: ...152 ...
Страница 156: ...154 ...
Страница 161: ......