7
STZSkW ed 12/07
ZEUS Superior kW
Technical Documentation
Technical Documentation
Boiler pump (1).
The boiler pump operates on the primary circuit return, im-
mediately downstream of the 3-way valve which is connected
to. It is part of the integrated multi-function group made out
of composite material.
The automatic vent valve (2) is also housed in the hydraulic
group casing.
Primary heat exchanger (1).
The primary heat exchanger is a lamellar water-gas heat ex-
changer with copper pipes and fins
(No. 77 fins on the 24 kW,
No. 89 fins on the 28 kW version and No. 105 fins on the 32 kW
version).
The NTC central heating flow probe (2) and the safety
thermostat (3) are positioned on its outlet pipe
(flow).
Primary heat exchanger is assembled with four tubes connected
in series (4).
Pipes with threaded fittings connect it to the pump flow and
the primary circuit flow.
Return
A = Head available to the system at maximum speed with by-pass excluded (adjusting screw completely tightened)
B = Head available to the system at maximum speed (screw tightened by 1.5 revulution with respect to the completely loose adjusting screw)
C = Head available to the system at maximum speed with by-pass open (adjusting screw completely loose)
ZEUS Superior 32 kW
H
ead (m H
2
O)
H
ead (kP
a)
Flow rate Litres/h
A
B
C
1
3
4
2
1
2
Flow
Содержание Zeus Superior
Страница 1: ...ZEUS Superior kW Wall hung room sealed boilers with storage tank ZEUS Superior kW...
Страница 2: ......