BOILER COMMISSIONING
(INITIAL CHECK)
To commission the boiler:
- make sure that the type of gas used corresponds
to boiler settings;
- check connection to a 230V-50Hz power
mains, correct L-N polarity and the earthing
connection;
- make sure the central heating system is filled
with water and that the manometer indicates
a pressure of 1÷1.2 bar.
- check that the heat pump is connected and
powered properly (see relative instructions
manual);
- check that the common parameters between
the heat pump and the boiler are configured
properly;
- switch the boiler on and check correct ignition;
- check the ∆p gas values in domestic hot water
and central heating modes;
- check the CO
2
in the fumes at maximum and
minimum flow rate;
- check activation of the safety device in the event
of no gas, as well as the relative activation time;
- check the intervention of the main switch
located upstream of the boiler and in the boiler;
- check that the intake and/or exhaust terminals
are not blocked;
- ensure activation of all adjustment devices;
- seal the gas flow rate regulation devices (if set-
tings are modified);
- check the production of domestic hot water;
- check sealing efficiency of water circuits;
- check ventilation and/or aeration of the instal-
lation room where provided.
If even only a single safety check offers a negative
result, do not commission the system.
3.1 WIRING DIAGRAM.
1 - 230 Vac 50 Hz power supply
2 - Status signal
3 - Yellow/green
4 - Blue
5 - Brown
6 - Red
7 - White
8 - Black
9 - Central heating
10 - Domestic hot water
11 - Yellow
12 - Purple
13 - Green
14 - Orange
15 - Pink
Key:
A3 - Integrated P.C.B
A4 - Display board
A7 - Relay P.C.B.
A19 - Relay P.C.B. 2
B1-1 - Boiler flow probe
B1-2 - System flow probe
B2 - Domestic hot water probe
B4 - External probe
B5 - Return probe
B6 - Domestic hot water flow meter
B9 - Domestic hot water inlet probe
CAR
V2
- Comando Amico Remoto remote
control
V2
E1 - Ignition electrodes
E2 - Detection electrode
E4 - Safety thermostat
E6 - Flue safety thermostat
E13 - Heat exchanger safety thermofuse
F1 - Phase fuse
G2 - Igniter
K1 - Off/On forcing relay
K51 - Central heating / cooling selector
relay
K52 - Anomaly relay
M1-1 - Boiler circulator pump
M1-2 - System circulator pump
M20 - Fan
M30 - Three-way valve
M40 - Domestic flow rate regulator
S5 - System pressure switch
S34 - System supervisor connection
selector
R14 - Boiler configuration resistance
T1 - Low voltage power supply unit
Y1 - Gas valve
The connector X6 is for connection to a personal
computer.
The connector X8 is used for software updating
operations.
Selector S34 defines boiler operation with the
external probe and must always be set = On.
Relays K2 and K3 can be configured.