![Immergas AVIO 24 2 ERP Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/immergas/avio-24-2-erp/avio-24-2-erp_instruction-booklet-and-warning_2047755003.webp)
USER
page
INSTALLATOR
page
MAINTENANCE
page
INDEX
Installation of the boiler ...........................5
1.1 Installation recommendations. ................5
1.2 Main dimensions. ......................................5
1.5 Gas attachment. .........................................6
1.6 Hydraulic attachment. ..............................6
1.7 Electrical connection. ...............................6
1.3 Antifreeze protection. ...............................6
1.4 Boiler connection unit. .............................6
chronothermostats (optional). ................7
1.9 External probe (optional). ........................7
1.10 Ventilation of the rooms...........................8
1.11 Evacuation of combustion products:
flue duct and branched multiple flues ...8
1.12 Flue exhaust control device. .....................8
1.13 System filling. .............................................8
1.14 Gas system start-up. ..................................8
1.15 Start-up of the boiler (ignition). ..............8
1.16 Domestic hot water boiler device............8
1.17 Circulation pump. .....................................9
1.18 Kits available on request. ........................10
1.19 Boiler components. .................................11
Instructions for use and maintenance ..12
2.1 Cleaning and maintenance. ...................12
2.2 Ventilation of the rooms.........................12
2.3 General warnings ....................................12
2.4 Control panel. ..........................................12
2.5 Ignition of the boiler. ..............................13
2.6 Fault and anomaly signals. .....................13
2.7 Boiler shutdown. .....................................14
2.8 Restoring heating system pressure. .......14
2.9 Draining the system. ...............................14
2.10 Draining the boiler. .................................14
2.11 Anti-freeze protection. ...........................14
2.12 Case cleaning. ..........................................14
2.13 Decomissioning. ......................................14
(initial check) ...........................................15
3.1 Hydraulic layout. .....................................15
3.2 Wiring diagram. ......................................16
3.3 Troubleshooting. .....................................16
other types of gas. ....................................17
3.5 Checks following conversion to
another type of gas. .................................17
3.6 Possible adjustments of the gas valve. ..17
3.7 Programming the circuit board.............17
3.8 Automatic slow ignition function with
timed ramp delivery. ...............................18
3.9 “Chimney sweep” function. ...................18
3.10 Pump anti-block function. .....................19
3.11 Three-way anti-block system. ................19
3.12 Radiator anti-freeze function. ...............19
3.13 Electronic card periodical self-check. ..19
3.14 Yearly appliance check and
maintenance. ............................................19
3.15 Casing removal. .......................................19
3.16 Variable heat power. ................................20
3.17 Combustion parameters. ........................20
3.18 Technical data. .........................................21
3.19 Data plate key. ..........................................22
3.20 Technical parameters for combination
Regulation 813/2013). ............................23
3.21 Product fiche (in compliance with
Regulation 811/2013). ............................23
Содержание AVIO 24 2 ERP
Страница 27: ......