48
Inspections and maintenance
Table of resistance values based on the heating probe (SR) and the
heating return probe (SRR) temperature.
T°C
0
1
2
3
4
5
6
7
8
9
0
32755
31137
29607
28161
26795
25502
24278
23121
22025
20987
10
20003
19072
18189
17351
16557
15803
15088
14410
13765
13153
20
12571
12019
11493
10994
10519
10067
9636
9227
8837
8466
30
8112
7775
7454
7147
6855
6577
6311
6057
5815
5584
40
5363
5152
4951
4758
4574
4398
4230
4069
3915
3768
50
3627
3491
3362
3238
3119
3006
2897
2792
2692
2596
60
2504
2415
2330
2249
2171
2096
2023
1954
1888
1824
70
1762
1703
1646
1592
1539
1488
1440
1393
1348
1304
80
1263
1222
1183
1146
1110
1075
1042
1010
979
949
90
920
892
865
839
814
790
766
744
722
701
Relation between the temperature (°C) and nom. resistance (Ohm) of
the heating probe SR and the heating return probe SRR.
Example: At 25°C, the nominal resistance is 10067 Ohm
At 90°C, the nominal resistance is 920 Ohm
4
INSPECTIONS AND
MAINTENANCE
Inspections and maintenance carried out to state
of the art and at regular intervals, as well as the
exclusive use of original spare parts, are of primary
importance for smooth operation and to guarantee
long boiler life.
Annual maintenance of the appliance is compulsory,
in accordance with Legislation in force.
Failure to carry out Inspections and Maintenance can
cause material and personal damage.
For this reason we recommend stipulating an inspection or maintenance
contract.
Inspection is required to determine the effective state of an appliance
and compare it with the optimal state. This is carried out through
measuring, checking, observing.
Maintenance is required to eliminate any deviation of the effective state
from the optimal state. This is usually carried out through cleaning,
setting and possibly replacing single parts that are subject to wear.
These maintenance intervals
are set forth by a specialist based on the
certified state of the appliance at the time of inspection.
Instructions for inspection and maintenance.
Only original Immergas spare parts must be used
to ensure a long life for all of the functions of your
appliance, and to avoid changing the conditions of
the approved standard product.
Before proceeding with maintenance operations, always carry out the
procedures described below:
- Turn off the mains switch.
- Separate the appliance from the electrical network using a separation
device, with a contact opening of at least 3 mm (for ex. safety devices
or power switches), and make sure it cannot be accidentally re-
connected.
- Shut the gas cut-off valve upstream of the boiler.
- If necessary, and based on the work that needs to be carried out, close
any cut-off valves on the heating flow and return.
Once the maintenance work has been finished, always carry out the
operations listed below:
- If necessary, open the heating flow and return.
- Relieve and, if necessary, restore the pressure in the heating system.
- Open the gas cut-off valve.
- Re-connect the appliance to the electrical network and engage the
mains switch.
- Make sure the appliance is water-tight, on the gas side and the water
side.