-10-
MOUNTING CENTRES
CWR
A
B
C
D
E
F
G
H
J
K
L
M
25
170
199
568
510
600
761
46
70
100
65
300
50
45
470
199
868
510
900
761
46
90
200
56
450
50
65
770
199
1168
510
1200
761
46
120
300
41
600
50
85
1070
199
1468
510
1500
761
46
130
400
36
750
50
3
If fitting the unit in a suspended ceiling after the ceiling has been installed, remove ceiling tiles to accept the
chassis, plus adjacent tiles on each side for general access. Use the ceiling tile support rail when the unit is
positioned some distance from the wall; the rail should be secured to the rear of the unit chassis prior to hanging
the unit.
4
The chassis should be supported by four (M8) bolts, or screwed rods and 12 nuts (M8 OD) on a suspended
ceiling, supplied by the installer.
On plasterboard suspended ceilings, remove sufficient of the ceiling to give clearance for the unit to be fitted, and for
access to pipework and electrics; trap doors should be left for service access to electrics and pipework.
On reinforced concrete ceilings use Rawlbolt shields or equivalent.
On wooden ceilings use battens for a mounting frame.
5
Suspend the chassis, using either 4 bolts and 4 washers (solid ceiling) or 12 nuts and 8 washers (suspended
false ceiling).
NOTE:
The mounting holes are keyhole slots and therefore the Rawlbolts should be installed prior to offering up the
unit.
--o--o--O--O--O--o--o--
Heronhill - for all your Airking requirements
Tel: 01823 665660
www.heronhill.co.uk
Fax: 01823 665807