
5
Prior to lighting, check all joints in the gas supply line for leaks. Use soap and water solution.
Do not use an open flame.
After piping has been checked for leaks, fully purge gas pipes to remove air.
GAS PRESSURES (ALL MODELS):
The available gas pressure should be the same as that indicated on naming plate. If incoming
pressure exceeds 5 kPa, an additional pressure regulator must be installed.
TESTING THE GAS SUPPLY PIPING SYSTEM:
When test pressures exceed 5 kPa, the fryer and its individual shutoff valve must be
disconnected from the gas supply piping system.
LEVELING THE FRYER
Check the level of the fryer by placing a level on top of the fryer after gas connections have
been made. Ensure that the fryer is level front-to-back and side-to-side in the final installed
position. If using casters, lock the wheels after unit is level.
Air adjustment
Содержание GF120
Страница 14: ...13 Parts list ...
Страница 17: ...16 iMettos Limited www imettos co uk ...