10. SCRAPPING THE HOIST
To scrap the machine at the end of its service life, carry out the
following steps:
a) Drain out the oil by removing the oil plug.
b) Separate the various plastic and electrical components (cables,
pendant control, etc.).
c) Divide up the metal components according to the type of metal
(steel, aluminium, etc.).
After the various components have been separated, dispose of
them through authorised disposal centres.
- Dispose of properly. These components can cause
accidents and pollution.
11. TROUBLESHOOTING
12. PROCEDURE IN EVENT OF FAULT WITH LOAD
SUSPENDED
- If possible remove the load from the nearest level, then dismantle
and service the hoist.
- If this is not possible, use another lifting machine (with adequate
lifting capacity) from higher up and suspend the faulty hoist both
at the load and at the hoist attachment point.
Lift the faulty hoist slowly off its tting, then lower the entire as-
sembly to the ground.
- Do not attempt to turn the brake adjustment nut, as it would
become uncontrollable.
- Do not attempt to repair the fault on the machine with the load
suspended.
13. NOISE LEVEL AT THE OPERATOR’S EAR
The level Lp(A) given in the TECHNICAL DATA chart corresponds
to the weighted equivalent sound pressure level on scale A of Eu-
ropean Directive 2006/42/EC. This level is measured with no load,
at the operator’s head in the working position 1.5 metres away
from the instrument, considering the different working conditions.
Fault
Cause
Remedy
The hoist does
not lift or lower
on command
Emergency stop
button engaged
Turn to disengage
No power to ma-
chine
Check
receptacle power
Plug not inserted
Insert the plug
Panel overload
tripped
Reset the overlo-
ad trip
button
Diffi cult to
lengthen the
telescopic arm
Lock knob too
tight
Loosen and
lubricate
assembly
SHOULD THE
PROBLEM
PERSIST
Contact IMER Technical Service or
your IMER DEALER.